Your video started at the base of the sign and went to the first building to the left, a very small portion of the total campus. But it was Great to see it! Edit: 1/8 of the frontage according to my mapping skills. here is an aerial picture:
im going to take a guess and say from end to end -(width) probably around 800 ft-when walking around the facilities you feel like its never ending as you go through all the buildings, there is alot of space both inside and out. the front offices are right by the pond in front and have 2 levels with about 8 offices and a conference room upstairs-the offices are connected directly to the assembly bay-electrowave has its own offices near where the new property has been cleared and towards the front of the property-from the highway to the rear of the property is about 400 feet
these dimensions are just an estimate -and to give a feel for the amount of property -imo they have some prime property on their hands to boot(JMHO)