Then the Padgetts aren't "done" are they? 12 for sure isn't, and if 11 needs to be frac'd (I thought it already had been frac'd and the issue was injecting the frac water into an injection well), then we're not that close to being done.
So the Padgett's seem kinda far from being done, at least to me...unless I'm missing something.
I think what silver would like to say if he knew what the fck he was posting about is, that the water that comes along with the gas and oil from the 11 and the 12 will be piped together and sent to the injection well for disposal thus saving the company a fortune in hauling it away. All in my most humble opinion.
I think the only thing that silver has said that is correct in saying is, it all probably will come together very soon.