You are the man!! This is excellent news. I’ve been watching the PHMSA website for any updates, but I haven’t seen any movement yet. Probably all related to administrative/clerical time to generate the formal report. All good things.
Great work. Were you able to determine if the testing pertained to just the repaired section? Did he mention if the hydrostatic testing been done over the entire length of the UTOs utilizing the pig entry point?