Just another aside:
I mean think about that, the public learns on July 16, 2025 the Survaxm curves had still not separated out, two days after ECA/RWD public comment submissions to MHRA on draft guideline were concluded, and two weeks before AUG 3 to Oct 1 DCVax-l MAA window maximum time MHRA/NWBO could take under max 3 rfi scenario on DCVax-l MAA — barring anything going wrong like (unlikely) delay beyond 210 days by MHRA or (unlikely) need for appeal by NWBO.