TerraFlow Energy Announces 9.6 MW / 5-Hour Vanadium Flow Battery Project in Bellville, Texas
TerraFlow Energy announces 9.6 MW, 5-hour vanadium flow battery project in Bellville, Texas, one of the largest long-duration deployments in the state. The system offers a fire-safe, non-lithium alternative for resilient, multi-hour energy delivery. The project includes a vanadium electrolyte lease enabled by Storion Energy, supporting cost-effective, scalable deployment. Initial energization is expected in Q1 2027.