Except to "verify" the ore composition requires several rounds of drilling, which, as far as is known, was never done. After all drill holes are assayed, a full feasibility study is done. Then and only then might a production decision be made.
That's how legitimate mining companies operate. They don't build a multi-million dollar processing plant, based on a wing and a prayer.
Of course, AABB is far from legitimate.