Either purchase some 4wd trucks (4 of them) or hire out for the same, and put an appropriate tarp to prevent spillage. And you are assuming that every pile will be drenched in a water solution, rather than stages of processing dry, or nearly dry.
And the cost for a drop site for the pilings near the processing center far exceeds the cost to transport it back, not to mention all of the regulatory issues at the new site, whereas the original site was already permitted.
And still you dodge your agenda, what a sleazy, slimy phony