News Focus
News Focus
icon url

Saving Grace

07/12/23 9:01 AM

#17025 RE: Saving Grace #16972

Massive Expansions at AMC 22% owned Hycroft Mine

On site facilities include an administration building, mobile maintenance shop, light vehicle maintenance shop, warehouse,
five leach pads, crushing system, two Merrill-Crowe process plants and a refinery. The components for a second refinery are
on-site and will be constructed as part of the expansion of mining activities. The crushing system was refurbished as part of the
restart activities and all other facilities are operational with the exception of the North Merrill-Crowe plant, which will be
rehabilitated and brought online when required. The gross carrying value of plant and equipment associated with the Hycroft
Mine as of December 31, 2022, was $86.6 million.


HYCROFT MINE
www.hycroftmining.com
World-Class Scale + Optionality + Significant Cash
With a successful history of heap leach operations, Hycroft is transitioning to a milling operation, adding
additional processes to our existing infrastructure to build a larger operation that will produce gold and
silver for many years to come.


Hycroft is an operating Gold and Silver mine with New buildings, roads, leach pads, crews and mining equipment. Fully permitted, CEO Diane Garrett.

https://hycroftmining.com/_resources/presentations/factsheet.pdf?v=0.684





















Bullish
Bullish