News Focus
News Focus
Replies to #6578 on TRUMP 2024
icon url

NYBob

06/24/23 3:09 PM

#6579 RE: MAGA_PATRIOT #6578

MAGA thanks - Lt. Governor Of NC Mark Robinson Endorses Donald Trump For President 2024





https://rumble.com/v2w4yvk-lt.-governor-of-nc-mark-robinson-endorses-donald-trump-for-president-2024.html

AMAZING DEPTH OF CORRUPTION EXPOSED !!!, 4124
WATCH




https://www.bitchute.com/video/rbdSGrq84wcT/

---- ----

RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish
icon url

NYBob

06/24/23 11:02 PM

#6580 RE: MAGA_PATRIOT #6578

MAGA Thanks - GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH




ttps://www.bitchute.com/video/36AuAAaZFoCP/

xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish
icon url

NYBob

06/25/23 6:47 PM

#6581 RE: MAGA_PATRIOT #6578

MAGA LIVE: President Trump Keynote Speech at Oakland County Republican Party Lincoln Day Dinner 6/25/23



https://www.youtube.com/watch?v=5DvX6WRDctg

More than 10,000 illegal immigrants are crossing the U.S. border each day -



https://www.youtube.com/watch?v=HaU2Tk6xog4

Ron DeSantis has just endorsed President Trump for President 2024



https://rumble.com/v2wb0vh-another-endorsement-for-45.html

World Freedom Directory
FIND A FREEDOM ORGANIZATION NEAR YOU

https://stopworldcontrol.com/map/?inf_contact_key=1d9fa0fd7d1fd994df0de27f34eb5af8d18a532c4142cb79caf2b269de1401fa
https://www.freedomwatchusa.org/time-criminals-of-the-year
https://www.freedomwatchusa.org/
https://www.freedomwatchusa.org/hillary-clinton-sued-for-alleged-wrongful-death-defamation

CAPTURED ON VIDEO - DEWS DIRECTED ENERGY WEAPONS IN ACTION
WATCH




https://www.bitchute.com/video/PltvmwHphy6B/

Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News




https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/

GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH




ttps://www.bitchute.com/video/36AuAAaZFoCP/

xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish
icon url

NYBob

06/26/23 5:50 PM

#6582 RE: MAGA_PATRIOT #6578

MAGA - Watch BREAKING NEWS & SITUATION REPORT 6/26: DEREK JOHNSON TALKS TRIBUNALS,
(CLONES OR MASKS?) & THE EBS!
WATCH




https://www.bitchute.com/video/DBIYfT3PrNOc/


xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish



Berit Brunback <bbrun_2@yahoo.com>
To:
Berit

Sun, Jun 25 at 1:15 p.m.

More than 10,000 illegal immigrants are crossing the U.S. border each day -



https://www.youtube.com/watch?v=HaU2Tk6xog4

Ron DeSantis has just endorsed President Trump for President 2024



https://rumble.com/v2wb0vh-another-endorsement-for-45.html

World Freedom Directory
FIND A FREEDOM ORGANIZATION NEAR YOU

https://stopworldcontrol.com/map/?inf_contact_key=1d9fa0fd7d1fd994df0de27f34eb5af8d18a532c4142cb79caf2b269de1401fa
https://www.freedomwatchusa.org/time-criminals-of-the-year
https://www.freedomwatchusa.org/
https://www.freedomwatchusa.org/hillary-clinton-sued-for-alleged-wrongful-death-defamation

CAPTURED ON VIDEO - DEWS DIRECTED ENERGY WEAPONS IN ACTION
WATCH




https://www.bitchute.com/video/PltvmwHphy6B/

Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News




https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/

GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH




ttps://www.bitchute.com/video/36AuAAaZFoCP/

xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish
icon url

NYBob

06/27/23 3:10 AM

#6583 RE: MAGA_PATRIOT #6578

MAGA Trump: 'We'll Demolish The Deep State, Expel the War Mongers, Drive Out the Globalists, Cast Out ...



https://rumble.com/v2wl6zq-trump-well-demolish-the-deep-state-expel-the-war-mongers-drive-out-the-glob.html

Trump Hardens Position on Abortion | Trump Rails Against Indictment| Donald Trump Speech Today



https://www.youtube.com/watch?v=VWzLKJ4cUKU

BREAKING NEWS & SITUATION REPORT 6/26: DEREK JOHNSON TALKS TRIBUNALS,
(CLONES OR MASKS?) & THE EBS!
WATCH




https://www.bitchute.com/video/DBIYfT3PrNOc/


xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish



Berit Brunback <bbrun_2@yahoo.com>
To:
Berit

Sun, Jun 25 at 1:15 p.m.

More than 10,000 illegal immigrants are crossing the U.S. border each day -



https://www.youtube.com/watch?v=HaU2Tk6xog4

Ron DeSantis has just endorsed President Trump for President 2024



https://rumble.com/v2wb0vh-another-endorsement-for-45.html

World Freedom Directory
FIND A FREEDOM ORGANIZATION NEAR YOU

https://stopworldcontrol.com/map/?inf_contact_key=1d9fa0fd7d1fd994df0de27f34eb5af8d18a532c4142cb79caf2b269de1401fa
https://www.freedomwatchusa.org/time-criminals-of-the-year
https://www.freedomwatchusa.org/
https://www.freedomwatchusa.org/hillary-clinton-sued-for-alleged-wrongful-death-defamation

CAPTURED ON VIDEO - DEWS DIRECTED ENERGY WEAPONS IN ACTION
WATCH




https://www.bitchute.com/video/PltvmwHphy6B/

Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News




https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/

GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH




ttps://www.bitchute.com/video/36AuAAaZFoCP/

xxxx xxxx

Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.

Selinsing Flotation Plant



Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.

Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.

With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.


As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.

Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.

Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.


Post by nozzpackon Jun 24, 2023


RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -

Figure 3: Selinsing Flotation Plant



So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month

We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments


Figure 2. Concentrate Shipment at Weighbridge


2023-06-23 12:22 ET - News Release



Ms. Cathy Zhai reports

MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE

Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.

President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.

The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."

Gold concentrate shipments and sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.

To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate are currently available for sale.

The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.

In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.

Commercial production update

The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.

Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.

Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.

Mining update

Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023


Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023


https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/

View PDF
Vancouver, B.C., June 23, 2023,

Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.

President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”

Figure 1. Loading Concentrate for Transport



Figure 2. Concentrate Shipment at Weighbridge


Gold Concentrate Shipments and Sales

Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.

An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.

Commercial Production Update

The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.

Figure 3: Selinsing Flotation Plant



Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.

Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.

Mining Update

Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.

Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.

Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.

Risks

Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.

The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com

New development to increase production from our Floatation Plant ....



With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:

....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.


.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.




This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).

In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.

I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .

We are in good hands,,

There is a lot going on on the Monument Mining website very interesting explanation

nozzpack thanks

https://monumentmining.com/projects/selinsing-gold-portfolio/development/

https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/

https://monumentmining.com/

https://monumentmining.com/investors/presentation/

https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf

https://monumentmining.com/news-media/photo-gallery/
Comment on this Post

God Bless
Amen

Bullish
icon url

NYBob

06/29/23 8:35 PM

#6588 RE: MAGA_PATRIOT #6578

MAGA - SITUATION UPDATE: CANADIAN WILDFIRE SMOKE IS BACK & SMELLS OF CHEMICALS AGAIN! MISSILE STRIKE...




https://rumble.com/v2x33en-situation-update-canadian-wildfire-smoke-is-back-and-smells-of-chemicals-ag.html

ELECTRIFYING TRUMP: THE LAST LINE OF DEFENSE AGAINST GLOBALIST DESTRUCTION AND WORLD WAR III
WATCH




https://www.bitchute.com/video/D_cvjs_2fAI/

God Bless
icon url

NYBob

06/30/23 5:43 PM

#6589 RE: MAGA_PATRIOT #6578

MAGA - Donald Trump Awarded 'Man of the Decade,' At Republican Party's Lincoln Day Dinner | Trump LIVE News



https://www.youtube.com/watch?v=-jm-QqKRv2A

Situation Update Stream 6.30.2023






https://rumble.com/v2x68v8-situation-update-stream-6.30.2023.html


JUST RELEASED! SEQUEL TO FALL OF THE CABAL! WORLD ECONOMIC FORUM WEF: THE DEVIL'S PLAYGROUND! BOOM!



https://rumble.com/v2x4y2l-just-released-sequel-to-fall-of-the-cabal-world-economic-forum-wef-the-devi.html

LOY BRUNSON UPDATES THE INSIDERS CLUB WITH CHARLIE WARD & DAVID MAHONEY.
WATCH -




https://www.bitchute.com/video/hlyAh9GoBGwd/

SITUATION UPDATE: CANADIAN WILDFIRE SMOKE IS BACK & SMELLS OF CHEMICALS AGAIN! MISSILE STRIKE...




https://rumble.com/v2x33en-situation-update-canadian-wildfire-smoke-is-back-and-smells-of-chemicals-ag.html

ELECTRIFYING TRUMP: THE LAST LINE OF DEFENSE AGAINST GLOBALIST DESTRUCTION AND WORLD WAR III
WATCH




https://www.bitchute.com/video/D_cvjs_2fAI/

God Bless
icon url

NYBob

07/03/23 5:37 PM

#6604 RE: MAGA_PATRIOT #6578

MAGA_PATRIOT - GOD JESUS All Need - We Are In War With Russia And Now The Evils Want WAR WITH CHINA -
Mass Murders To Depopulate With WWIII Ex...
DNI RATCLIFF - WAR WITH CHINA COMING, 4131
WATCH - JESUS Alive - Evils Kill HIM if evils knows were HE is -




https://www.bitchute.com/video/D3ncqZPcf1fh/

Insane Cabal Dance Kazarian King Pin Rothchild Genocide Pipe - To All -
HAPPY 4TH -
Dr Judy Mikovitz | “Vaccine AIDS Is Covid-19.
GOD Is All You Need!”




https://rumble.com/v2xvoam-dr-judy-mikovitz-vaccine-aids-is-covid-19.-god-is-all-you-need.html



https://www.americanthinker.com/blog/2023/07/trump_draws_em.html

TOPICS COVERED: COMING BLACKOUTS, MILITARY IN MAJOR US CITIES FOR BIG RIOTS, BRUNSON CASE & 2020 ELECTION, WHITEHATS, CHEMICAL FIRE SMOKE OVER EASTERN US, MORE TRAIN DERAILMENTS TO COME, HEAVY MILITARY ON WEST COAST PREP FOR FF EVENT…EARTHQUAKE OR TSUNAMI? .




https://rumble.com/v2xr6a2-big-intel-update-7223.html


Prayers Needed Cabals Deep State Want The 500mil Muslims Oil So They Pay them To Leave - EUROPE FALLING TO
VIOLENT ISLAMIC INVASION / REPLACEMENT MIGRATION - soon it be here if not stopped
by Trump -
WATCH




https://www.bitchute.com/video/gzzTAHHU0fC4/

RUSSIAN POWER PLANT EVACUATIONS, POLAND REQUESTS US NUCLEAR MISSILES, UKRAINE WAR ESCALATION W/NUCLEAR THREAT, BLACKOUTS, PRESIDENT TRUMP, FEDNOW/CBDC, QFS, GCR/JUDY BYINGTON UPDATE, BIDEN IMPEACHMENT, BIDEN /CHINA SCHEME, WHISTLEBLOWERS GONE MISSING, JAB FRAUD, CLIMATE FF EVENT IN MIDWEST, SOUND OF FREEDOM MOVIE, RUSSIAN MOD AND MORE.




https://rumble.com/v2xgh14-situation-update-7123.html


Blessing - Navy SEALs Save Children From Child Sex Slavers - M.Baxter RealRawNews 6-27-23



https://rumble.com/v2wq8q6-navy-seals-save-children-from-child-sex-slavers-m.baxter-realrawnews-6-27-2.html


Stop World Control WORLD DOMINATIONCRIMES AGAINST HUMANITY
SAVING THE WORLD
INFO

https://stopworldcontrol.com/map/?inf_contact_key=1d9fa0fd7d1fd994df0de27f34eb5af8d18a532c4142cb79caf2b269de1401fa

Navy SEALs Save Children From Child Sex Slavers



https://rumble.com/v2wzor7-navy-seals-save-children-from-child-sex-slavers.html

*LIVE* ~ Pres. Donald J. Trump Holds Save America Rally in Pickens, SC. >

Saturday, July 1, 2023: Join the RSBN team LIVE from Pickens, SC.

for all day coverage of President Donald J. Trump’s Save America Rally in Pickens, SC.


45th President of the United States Donald J. Trump to Celebrate Independence Day in Pickens, South Carolina ...
President Donald J. Trump, 45th President of the United States of America, will celebrate
Independence Day and deliver remarks to “First in the South” voters,
along with state lawmakers and other special guests in Pickens, South Carolina
on Saturday, July 1, 2023, at 1:00PM EDT.


https://www.rsbnetwork.com/news/watch-live-president-donald-j-trump-holds-save-america-rally-in-pickens-sc-7-1-23/



Donald Trump Awarded 'Man of the Decade,' At Republican Party's Lincoln Day Dinner | Trump LIVE News



https://www.youtube.com/watch?v=-jm-QqKRv2A

Situation Update Stream 6.30.2023






https://rumble.com/v2x68v8-situation-update-stream-6.30.2023.html


JUST RELEASED! SEQUEL TO FALL OF THE CABAL! WORLD ECONOMIC FORUM WEF: THE DEVIL'S PLAYGROUND! BOOM!



https://rumble.com/v2x4y2l-just-released-sequel-to-fall-of-the-cabal-world-economic-forum-wef-the-devi.html

LOY BRUNSON UPDATES THE INSIDERS CLUB WITH CHARLIE WARD & DAVID MAHONEY.
WATCH -




https://www.bitchute.com/video/hlyAh9GoBGwd/

SITUATION UPDATE: CANADIAN WILDFIRE SMOKE IS BACK & SMELLS OF CHEMICALS AGAIN! MISSILE STRIKE...




https://rumble.com/v2x33en-situation-update-canadian-wildfire-smoke-is-back-and-smells-of-chemicals-ag.html

ELECTRIFYING TRUMP: THE LAST LINE OF DEFENSE AGAINST GLOBALIST DESTRUCTION AND WORLD WAR III
WATCH




https://www.bitchute.com/video/D_cvjs_2fAI/

God Bless
icon url

NYBob

07/04/23 11:56 PM

#6607 RE: MAGA_PATRIOT #6578

MAGA - Biden Blocking Sun & Destroying Earth – Dane Wigington
By Greg Hunter On July 4, 2023 In Political Analysis 9 Comments






https://usawatchdog.com/biden-blocking-sun-destroying-earth-dane-wigington/

China is in default on a trillion dollars in debt to US bondholders. Will the US force repayment?
BY ANDREW HALE, OPINION CONTRIBUTOR - 07/04/23 7:00 AM ET


https://thehill.com/opinion/international/4075341-china-is-in-default-on-a-trillion-dollars-in-debt-to-us-bondholders-will-the-us-force-repayment/


To All - HAPPY July 4th - Independence Day Dive with Retired U.S. Navy SEAL Master Chief - The Real Story - OAN





https://rumble.com/v2y6s6q-independence-day-dive-with-retired-u.s.-navy-seal-master-chief-the-real-sto.html

Goody - SATANIC ELITES EXPOSED - PART 8 - GATES OF HELL (BILDO GATES)
WATCH




https://www.bitchute.com/video/KCMsUAneW4Nx/

Doctors Sue Biden Admin for Blocking Ivermectin as Covid Treatment

“There is substantial evidence for the efficacy of ivermectin in treating COVID-19, and no evidence
for serious or fatal side effects associated with the doses used to treat COVID-19.”


https://slaynews.com/news/doctor-sue-biden-admin-blocking-ivermectin-covid-treatment/

The Shocking Truth About WTC 7 and The Twin Towers: Stunning Evidence Of Controlled
Demolition

video in link

https://www.theburningplatform.com/2023/07/04/the-shocking-truth-about-wtc-7-and-the-twin-towers-stunning-evidence-of-controlled-demolition/



icon url

NYBob

07/06/23 10:17 PM

#6610 RE: MAGA_PATRIOT #6578

MAGA - SHOCKING VAX STUDY BURIED BY MSM! - MASSIVE DEATH TOLL CLIMBS AS NEXT PHASE
OF TYRANNY IS PLANNED!
WATCH




https://www.bitchute.com/video/aSfUcrH3hVl0/

MASS VACCINATION AND DOCTOR, PILOT, ATHLETE, POLICE DYING SUDDENLY COMPILATION
WATCH






https://www.bitchute.com/video/ft6PvDNrPXsT/

Trump Rally *LIVE* : President Donald J. Trump Holds MAGA Rally
in Council Bluffs, IA – 7/7/23 ~ Coverage begins @ 9am ..


https://www.rsbnetwork.com/featured/trump-rally-live-president-donald-j-trump-holds-maga-rally-in-council-bluffs-ia-7-7-23/

45th President of the United States Donald J. Trump to hold Make America Great Again rally in Council Bluffs, IA.

Venue: MidAmerica Center, 1 Arena Way, Council Bluffs, IA 51501


Timeline of Events
10:00 AM – Doors Open
11:30 AM – Program Begins
1:00 PM – 45th President of the United States >
Donald J. Trump Delivers Remarks ..



https://www.gatestoneinstitute.org/19780/sex-trafficking-child-abuse-biden-administration

EXPOSE the PEDOS end of the CABAL - worship the devil. Watch out !!!

https://rumble.com/v2y1m00-shriners-and-freemasons-worship-the-devil.-watch-out-.html

https://rumble.com/c/EXPOSEthePEDOSendOfTheCabal

Watch Politix DESTROYS Mother Of Three



https://youtu.be/tLWTaBP2jcQ

SATANIC ELITES EXPOSED - PART 7 —
MUSIC INDUSTRY — MILITARIZED MICROWAVE MK ULTRA
-->>

https://rumble.com/v1kj1o1-satanic-elites-exposed-part-7-music-industry-militarized-microwave-mk-ultra.html
-
?? SATANIC ELITES EXPOSED - PART 8 —
GATES OF HELL
-->>
https://rumble.com/v1kj17d-satanic-elit
-
?? SATANIC ELITES EXPOSED - PART 9 —
THE 9TH CIRCLE CULT
----->>>>
https://rumble.com/v1kj0xx-satanic-elites-exposed-part-9-the-9th-circle-cult.html
-
??SATANIC ELITES EXPOSED - PART 10 -
Nazi Philosophy
---->>>>
https://rumble.com/v2c3tvm-satanic-elites-exposed-part-10-nazi-philosophy.html
-
?? Satanic Elites Exposed - Part 11
Dr. Tam's 11th Hour Tik Tok
--->>>>
https://rumble.com/v2c3us0--satanic-elites-exposed-part-11-dr.-tams-11th-hour-tik-tok.html
-
?? SATANIC ELITES EXPOSED - PART 13 - ELON MUSK'S TRANSFORMATION
---->>>>
https://rumble.com/v2c3x4a--satanic-elites-exposed-part-13-elon-musks-transformation.html
-
?? SATANIC ELITES EXPOSED - PART 14 — JOHNSON & JOHNSON LAWSUITS
-->>
https://rumble.com/v1kj0o7--satanic-elites-exposed-part-14-johnson-and-johnson-lawsuits.html
-
?? SATANIC ELITES EXPOSED PART - 15 —
WEATHER WAR GAMES
-->>
https://rumble.com/v1kj0a1--satanic-elites-exposed-part-15-weather-war-games.html
-
?? SATANIC ELITES EXPOSED - PART 16 —
CANADIAN DUMB DEEP UNDERGROUND MILITARY
-->>
https://rumble.com/v1kj001-satanic-elites-exposed-part-16-canadian-dumb-deep-underground-military.html
-
?? SATANIC ELITES EXPOSED PART - 17 —
FREE MASONIC SYMBOLS
-->>
https://rumble.com/v1kiz6l--satanic-elites-exposed-part-17-free-masonic-symbols.html
-
?? SATANIC ELITES EXPOSED - PART 18 —
AUSTRALIAN DUMBS WITH GENE DECODE
-->>
https://rumble.com/v1kiyn5--satanic-elites-exposed-part-18-australian-dumbs-with-gene-decode-httpst.m.html
-
?? SATANIC ELITES EXPOSED PART - 19 —
U.S. DUMBS WITH GENE DECODE
---->>>>
https://rumble.com/v1kiy6r-satanic-elites-exposed-part-19-u.s.-dumbs-with-gene-decode.html
-
?? SATANIC ELITES EXPOSED — PART 21 —
AFRICAN DUMBS WITH GENE DECODE
-->>
https://rumble.com/v1kie3z--satanic-elites-exposed-part-21-african-dumbs-with-gene-decode.html
-
?? SATANIC ELITES EXPOSED - PART 22 —
HAARP IONOSPHERIC HEATERS WORLD WIDE
-->>
https://rumble.com/v1kibxd-satanic-elites-exposed-part-22-haarp-ionospheric-heaters-world-wide.html
-
?? SATANIC ELITES EXPOSED -- PART 23 —
MORMON'S DNA HARVESTING VAULTS
-->>
https://rumble.com/v1kia43-satanic-elites-exposed-part-23-mormons-dna-harvesting-vaults.html
icon url

NYBob

07/15/23 1:20 PM

#6634 RE: MAGA_PATRIOT #6578

icon url

NYBob

07/23/23 2:36 PM

#6645 RE: MAGA_PATRIOT #6578

MAGA President Donald Trump expressed strong concerns over the potential admission of Ukraine
into the North Atlantic Treaty Organization, or NATO.




https://flvoicenews.com/trump-warns-against-ukraines-nato-admission/

The former president spoke to alleged corruption within President Joe Biden’s family and the risk of
dragging the United States into a catastrophic global conflict.

Trump accused Biden of being “corrupt” and accepting millions of dollars in bribes from foreign
nations, namely China and Ukraine.

According to Trump, these allegations of corruption raise serious doubts about Biden’s ability to make
sound decisions regarding international relations, particularly with respect to Ukraine’s NATO
membership bid.

“The notion that we would even consider admitting Ukraine into NATO at this time is completely
unhinged,” Trump asserted in the video, urging caution against such a move.



RE: Analyst Ratings of Monument Mining
Forecast Cash flow of 8 cents per share for 2023


https://www.marketbeat.com/stocks/CVE/MMY/

Fiscal 23/24 started July 1/23.

I don't know the source of this estimate ...FRC?...but let's take a conservative look at how this might be achieved.

F23/24 concentrate production of 40,000 ounces

Concentrate Price of $1750 US

Breakeven Price $200 US above FS.....ie $1300 US

So, we have 40000 Oz X $450 US per ounce free cash flow = $18 million US in FREE cash flow
which is $24 million in CAD which is 8 cents per share in FREE cash flow.

Cash flow is operating earnings which is gross margin less operating expenses and is signifucantly
higher than FREE cash flow which is gross margin less ALL expenses .

So, using very conservative financial and production metrics , cash flows of 8 cents per share is
eminently doable this first full FP production year of 2023/ 24

Have a great weekend




LIVE WITH DR. BRYAN ARDIS
WATCH




https://www.bitchute.com/video/Dyyr3jgPrRC7/

Analyst Ratings of Monument Mining
A quick google search has yielded the following information...

Forecast net Earnings of 0.012 for 2023 versus loss of $0.03 in 2022




https://www.barrons.com/market-data/stocks/mmy/research-ratings?countrycode=ca&mod=quotes#subnav



Forecast Cash flow of 8 cents per share for 2023



https://www.marketbeat.com/stocks/CVE/MMY/

One BUY rating but note also that we are up 57% YTD which has got to be one of the best
performers among microcap Juniors.....leaves little doubt that we are on our way , with short consolidations, for the next run up the charts , hopefully to $0.20 by late summer


https://www.marketwatch.com/investing/stock/mmy?countrycode=ca


Burnakura Mill…Making Money While We Wait



Burnakura mill being open to toll milling while we wait for ODY.



Depending on the grade, about 25,000 to 30,000 ounces which should bring in about $5 million cad
per annum and at the same time keeping the mill and camp in full operating mode.




There are several neighbours that might avail of such a service..

The plant is done with the third phase crusher now installed...



Monument Mining Limited (MMY : MMTMF) is a Canada-based gold producer and mining asset developer.



The Company owns and operates the Selinsing Gold Portfolio in Malaysia and the Murchison Gold
Portfolio in Western Australia.




The Selinsing Gold Mine is located in Pahang State, within the Central Gold Belt of Western Malaysia,
comprising the Selinsing, Buffalo Reef, Felda Land, Peranggih and Famehub projects .
The mine has about one million ton per annum gold processing CIL plant, which is situated
approximately 158 kilometers (km) north of Kuala Lumpur.
Murchison is located in the Murchison region in Western Australia and comprises the Burnakura,
Tuckanarra, and Gabanintha projects, which are located in the Murchison goldfield of Western
Australia, approximately 40 km southeast of Meekatharra and 765 km northeast of Perth.

The Company owns a producing mine, a producing site with a gold plant and all infrastructure, and a
large prospective land position, covering approximately 382.9 square kilometers.
Monument Mining Ltd:

https://monumentmining.com
https://monumentmining.com/news-media/photo-gallery/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/news-media/news/



MMY; normaly next week new video and also new presentation. if goldprice more 1900 i think we got
a good cash flow




Gold Legal Tender God's Real Money.
Amen
icon url

NYBob

08/06/23 8:10 PM

#6677 RE: MAGA_PATRIOT #6578

MAGA - The Orchestrated Cases Against Trump Explained
Tyler Durden's Photo
BY TYLER DURDEN
SATURDAY, AUG 05, 2023 - 04:30 PM
Authored by Paul Craig Roberts,

President Trump has broken no laws.

The charges against Trump brought by corrupt Democrat appointees are for propaganda purposes
and for sidelining the candidate who the Democrats know will win the next election.


https://www.zerohedge.com/political/orchestrated-cases-against-trump-explained




Watch Mark Levin: This indictment is crap!
Fox News
10.6M subscribers




https://www.youtube.com/watch?v=ykBjAHiGQOU

BREAKING NEWS SITUATION REPORT 8/30: THEY'RE TRYING TO KILL ME! NEW
TRUMP INDICTMENT MOABS DROP!
WATCH






https://www.bitchute.com/video/ozvZZS0JAyqm/

1000 YEARS OF PLANNEDEMICS PART 3: HISTORY SHOWS, VACCINES NEVER DID ANYTHING BUT HARM -- ICIC.LAW
WATCH






https://www.bitchute.com/video/VwtNqC57u6Hy/

Q ~ Deep State Decodes #655 ~ Save Trump. MAGA is BACK



https://rumble.com/v353o02-q-deep-state-decodes-655-save-trump.-maga-is-back.html

SITUATION UPDATE 8/5: "NO WEAPON FORMED AGAINST ME SHALL PROSPER!" YOU JUST CAN'T STOP TRUMP! BOOM!



https://rumble.com/v352rs2-situation-update-85-no-weapon-formed-against-me-shall-prosper-you-just-cant.html

Wehman, Brunson & Vernuccio: NOKO and the Nukes, plus the hot button topics
Inside The News for radio affiliate broadcast weekend of AUG 05, 2023.




https://rumble.com/v34r11u-noko-and-the-nukes-plus-the-hot-button-topics.html

GREG HUNTER: TRUMP INDICTED AGAIN, MORE CV19 VAXXX MURDER & USA RATING CUT



https://rumble.com/v351234-greg-hunter-trump-indicted-again-more-cv19-vaxxx-murder-and-usa-rating-cut.html

Tucker Carlson on Twitter Ep. 12 #Part 2



https://rumble.com/v34ukhq-tucker-carlson-on-twitter-ep.-12-part-2.html

Situation Update 08/05/23 ~ Trump Return - Q+ White Hats Intel ~ Derek Johnson > SGAnon -

https://rumble.com/v34j51e-derek-johnson-big-intel-aug-4-military-occupancy-and-coop-red-pill-vid.html



https://rumble.com/v34txlq-situation-update-080523-trump-return-q-white-hats-intel-derek-johnson-sgano.html

God Bless