InvestorsHub Logo
icon url

stew1340

09/19/22 11:53 AM

#152 RE: uksausage #151

All i can come up with. Engineering for the 240 kW demonstration is currently underway, with construction expected to begin in late 2023 and power-on expected in early 2024.
https://www.sciencedirect.com/science/article/abs/pii/S0360319921030846

Wind-powered 250 kW electrolyzer for dynamic hydrogen production: A pilot study
Author links open overlay panelChangZhangJinyiWangZhiboRenZhiyongYuPengjieWang

https://www.energy.gov/eere/fuelcells/articles/us-hydrogen-electrolyzer-locations-and-capacity