Got some SNPW breakfast for folks, page 15 of 28 of the air permit application. Step by step process flow description. The Pyrolysis unit is just one of 18 major unit operations as we Chemical Engineers call them. Any questions just reply to this post. Not that are two external inputs and only 2 external outputs. The electric power generation output is 3, but not shown on the air permit, no need to show it on the air permit. All the rest of the units are looped into each other. A marvel of today's high speed small low cost electronics controls, CPUs and sensors...