#79936 RE: Beth0515 #79935

ACA howe completed 3 Ni 43-101 all of which were posted on the medinah web until tupper removed them in 2016 These reports were done on the ldm after drilling and then two on the 28 holes drilled on the alto The first was after about 10 holes and the final after the entire 28 drill hole programme was completed Based on the drilling and these reports Gordon House did his preliminary resource calculations on the alto which was published in 2004 on the web I saved a copy of this report.