150 tons per day. Sounds more than just one running. If max production output is 15 tons. Let’s say they tweaked it..
Could they push out 3 more tons per machine? Maybe.. or was the tweak for garbage separation to keep the impurities out?
Simple math here-
If it’s 15 tons max:
150 max output / 10 machines = 15 tons per machine.
If LRS wanted only 8 machines per the original agreement. The tweak is in the production then.
150 max output. / 8 machines= 18.75 per machine. (There is the tweak buddy boy)