RealDutch

04/06/17 10:49 AM

#110623 RE: DougS. #110621

You should keep an eye on the area roughly 500 yards to the south west. That's where AF5 will be constructed.

icon url

RealDutch

04/06/17 10:58 AM

#110626 RE: DougS. #110621

The area where building #3 goes is now a dark rectangle. Without better resolution I'm not sure what that means but I think its showing the soil freshly leveled and still wet. But that's a guess.



Could it be cement?
icon url

The Swede

04/28/17 10:56 AM

#111476 RE: DougS. #110621

Doug has access to the Senitel satellite images.
icon url

DougS.

05/05/17 12:24 AM

#111568 RE: DougS. #110621

A minor update from the Landsat-8 satellite. This is a poor image and not intended to be very informative. The Landsat-8 takes the highest resolution photos for google but they're normal flyover is lower quality than the Sentinel-2.



These are basically just blobs of color. But even with the poor resolution, my personal take is that there isn't any concrete being poured or any vertical elements being constructed yet. Sentinel-2 will make a pass in a couple days and if it's a good shot we will know more. But the weather says it will be rainy...
icon url

RealDutch

05/29/17 2:04 PM

#112200 RE: DougS. #110621

The area where building #3 goes is now a dark rectangle. Without better resolution I'm not sure what that means but I think its showing the soil freshly leveled and still wet.



According to Page 15 of the 10-Q, 40% of the 3rd building was completed ;-) Ground & infrastructure work