I THINK THE STOCK WILL BE MOVING AROUND MID MARCH 2016.TWO WEEKS BEFORE THE Q4 AND YEAR END FILING REPORT.WHEN EVERYONE SEES THE REPORT AND NUMBERS IN THE FILING,THEN WE HAVE 100% PROOF.LOOKING FORWARD TO 2016.
We'll see, the comment about their delays in issuing the LOC gives me pause but if the equipment is meeting their specifications then I'm hopeful a follow up order will follow.
Like all things in Africa though it'll take a while.
I think we (AMMX) is going to get that follow up order from the Mali contractor, this could be about 4 million dollars, maybe more. As you will recall there were two follow up orders discussed, the second follow up order was presented as a need for paving equipment. The first order was for various construction equipment some of which to be used in the housing construction project. I do not think it is going to happen before the end of the year but probably during the first quarter.