InvestorsHub Logo

Goldstrike

04/27/14 6:15 PM

#62830 RE: Medinaminer #62828

The DDH-002 drill core samples, by definition, can not include sampling over hundreds of tons of ore.
The quality of sampling taken at the various shaft depths does indeed pose a valid question. Despite that, hundreds of tons of ore can not be extracted say, from the 66.5 or 67 meter levels of the shaft due to the confines of the shaft dimensions.