My property is very hilly. It took a long time and a lot of work to move soil to the site for the workshop to get a large enough level surface. And even doing that, one corner of the building doesn't have dirt under it. Instead of pouring a footing there, we simply drilled into the bedrock and put the rebar into the rock.