Just seems funny that this BK was filed right at the same time as the Mitchell #3 was drilled. The g motion was filed the same day as TECO puts out a PR about the #3 flow rates and the #4 is put online. Coincidence? Probably not. I don't need to make things up, the facts speak for themselves.