AEP Raises Transmission Capacity This live-line reconductoring, requiring 1,440 miles (2,317 km) of conductor, will be the largest ACCC deployment in the United States. AEP chose ACCC for its high load capacity, strength and resistance to corrosion. The well-tested product, manufactured by CTC Global, can replace the existing line without increasing clearances or rights-of-way. http://tdworld.com/overhead-transmission/aep-raises-transmission-capacity