And your point? #2 was obviously the truth since in early 2012 it was assembled and running. #3 kilns were delivered in May 2012, as we have pictures, but it was used to repair #1. I suspect the kilns were ready long before that but only delivered in May 2012 after the financing.
May 2012:
Raw
Research & analysis on some of my favorite stocks is located on the sticky note on the SwingTrade board.