Thursday, February 14, 2013 3:04:58 AM
Phillip Walford Discusses Marathon’s Nfld Gold Exploration
Kevin Michael Grace
February 13, 2013 - Marathon Gold Corp T.MOZ announced February 7 assay results from six shallow drillholes at the Valentine East Zone of its Valentine Lake Project in Newfoundland. Highlights include:
1.6 grams per tonne gold over 14 metres
including 10.34 g/t gold over 1 metre
1.93 g/t gold over 9.5 metres
including 14.77 g/t gold over 0.95 metres
1.58 g/t gold over 3 metres
including 4.48 g/t gold over 1 metre
2.44 g/t gold over 3 metres
1.23 g/t gold over 3 metres
1.52 g/t gold over 6 metres
2.28 g/t gold over 2.85 metres
1.89 g/t gold over 2.85 metres
The Valentine Lake Project comprises more than 20,000 hectares located 57 kilometres south of Buchans. It can be reached from gravel and paved roads off the Trans-Canada Highway. According to a November 5, 2012, 43-101 resource estimate, its Leprechaun Gold Deposit contains 9.53 million tonnes grading 2.22 g/t gold for 682,000 ounces gold measured and indicated and 1.96 million tonnes grading 2.3 g/t for 145,000 gold ounces inferred.
President/CEO Phillip Walford spoke to Kevin Michael Grace February 8, read the interview here: http://resourceswire.com/2013/02/on-strike-for-almost-30-kilometres/
UAV Corp Skyborne Technology Secures $105M in Sales Contract LOIs for Revolutionary DART Series Airships • UMAV • Jan 13, 2025 11:00 AM
SANUWAVE Health Announces Preliminary Revenue Results for the Fourth Quarter 2024 (Ended December 31, 2024) • SNWV • Jan 13, 2025 8:10 AM
SANUWAVE Health Appoints Industry Veteran Timothy Wern as Executive Vice President of Sales • SNWV • Jan 13, 2025 8:08 AM
North Bay Resources Announces Operation of New Gravity Circuit at Bishop Gold Mill, California • NBRI • Jan 10, 2025 8:29 AM
Cannabix Technologies Announces Key Hardware Advancements to Marijuana Breathalyzer Technology • BLO • Jan 9, 2025 8:49 AM
UAV Corp. (UMAV) Further Reduces Authorized Shares to 500 Million • UMAV • Jan 8, 2025 2:27 PM