Mill Drain Pond dewatered and backfilled. CHECK Ore Pad storage area cleared, graded, liner repaired, containment berms reconstructed. Ready for certification. Check Construction of MSHA safety berms and excavation of the upland drainage ditch for the mill building. Check Tailings Pond dewatered. Check All per plans approved by DRMS via AM-03 and TR-ll Check $CGFI