Well SIRG does have the proven ores, proven by testing by 3 separate international companies. And SIRG does have an NI 43-101 that was produced by Roscoe Postle Associates, Inc. (wwww.rpacan.com)
unlike another company that is still digging in the gravel piles looking for gold that may or may not be sufficient and high grade enough for a mining operation.
And I am sure that Rod relied on that NI 43-101 report that said;
Since the Emerald Isle Property is a former copper producer, RPA understands that environmental impact and hydrologic studies have been carried out and new permitting is not required.
Additional geotechnical studies, however, are required by the current operator of the project prior to the new development of the project.
Included in the authorizations needed for the restart of mining at Emerald Isle, are water permit and authorization from the Government of the State of Arizona. In terms of permitting, the current property status is as follows:
• Aquifer Protection Permit No. P-101846: issued on June 4, 1993 for the life of
the project.
• Air Quality Pending Class II Source (ADEQ): filed on December 5, 1995 and
amended December 21, 1995.
• ADEQ-Mining Plan of Operations MPO 388-K-03: issued December 1988 for
life of mine. Revised on October 15, 1993.
• Notice of Restart:
o ADEQ Air Quality (Pending): December 5, 1995.
o ADEQ APP: December 22, 1995.
o BLM: December 5, 1995
o NPDES storm water runoff discharge
LOAD THE BOAT