Putting together the last 6 months highlights: (All can be found in PR’s) Mine up and running. 7/2011 Found problem with tubes not draining fast enough to keep up with production. Additional tubes needed. 9/2011 Mime shut down because of liners for 6 weeks. 10/2011 Received approval for additional tubes and installed. 11/2011 Needed to remove more material before discharge water get to tube so sand screw is put in place. 12/2011 I am not looking for great numbers yet, but first quarter (weather permitting) we should be in full production with good recovery. Also I think anything under .02 is a bargain right now. I have been loading at this level and just reached a cool MILLION. GO PCFG IMO. Debate away : ) DF