News Focus
News Focus
Followers 40
Posts 3318
Boards Moderated 0
Alias Born 08/18/2009

Re: dreaminbig post# 132489

Thursday, 09/01/2011 11:36:28 AM

Thursday, September 01, 2011 11:36:28 AM

Post# of 312101
Pre-melt won't melt metal.. neither would the main reactor (low temp). Residue clean-out is automated now -- no shut down (= no slow down). As for the % metal:plastic .. the rate of throughput (20 tons/day) is only limited by the condenser and not at all about the feeding of raw feedstock into the system. Therefore only the hydrocarbon mass rate-of-condensing will throttle the system. So even if ragger-tail is 50% non-plastic (by weight), the system should still approach 20 tons of hydrocarbon input per day.. or 40 tons of ragger tail. I would imagine that all other aspects of the system can keep up: feeder, pre-melt, residue, etc.

That's my understanding of it anyway...

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y