"Mike McLaren, the President and CEO of W2 Energy, recently returned from Tucson, Arizona, where he spent 3 days commissioning the first iteration of the AzRISE CAES system. Since his return to Guelph, Ontario, he has been working with W2 Staff to build the next generation AirRocket to mate with the AzRISE system. Once tested at AzRISE the entire CAES system will be installed and tested at the Tucson Electric Power site featuring Solon solar technology"
So what happened at AzRISE? It didn't work, so back to the drawing board? Is this project on hold until we fit in a new "AirRocket?"