News Focus
News Focus
Followers 401
Posts 63153
Boards Moderated 3
Alias Born 11/25/2007

Re: None

Tuesday, 08/09/2011 8:58:16 PM

Tuesday, August 09, 2011 8:58:16 PM

Post# of 91122
CWRN~ Colossus!! HUGE!! The Coloso VEIN!! The main thing is PRODUCTION~ We have to have the ORE and get it out of the ground to ship it.. Hello! lol.

we have too much work to do on the Coloso Vein, as it extends for 1,112 meters in length.

Bob Coton



The Coloso Vein as it traverses across the West side of Guadalupe at 275dg NW and turns to 325dg NW at elv 10 for a couple hundred meters. At the bottom elevation no. 1, the strike continues down into the Guadalupe River and outcrops on the east bank (onto Navial Mineria’s concession between the west and east side of the Guadalupe River). The strike has been measured in the pit area at some 100 meters in width; for the most part it widens and narrows throughout the strike. The area that is marked in the white triangle box is the area that all of the iron ore was taken for the 2nd shipment. Work continues in that area at over 20 meters excavation and the bottom as of today still has not been reached. Between elv 1 and 2 no excavation has been done, between elv 7 and 11, its was top stripped and the Coloso Vein was discovered at 13 meters depth, no work is currently going on there.

Bob

Discover What Traders Are Watching

Explore small cap ideas before they hit the headlines.

Join Today