As the Apr 5 PR and subsequent blogs noted,after the Kriton left they wanted to catch up on the consolidation and processing of the 1-3mm ore while they simultaneously excavate,crush and process more 3-18 mm. So they are building and processing 2 separate products for 2 contracts. The estimated production of ca 30k tons/month 3-18 mm ore could fill a Kriton in 40 days. Which will be rising as they add additional equipment. Don't know how much 1-3mm ore is available but the decision to consolidate and process it could mean they are approaching shipsize for it also. The point is they simultaneously have 2 products growing in size in prep for shipping,not counting the waist green product and the mostly human interest copper. So these products could possibly be ready to ship within a short time of each other.