Monday, July 26, 2010 11:29:40 AM
WHO HAS DOUBT ABOUT HANDCAMP RESULTS??????????
LOOK AT THE HANDCAMP RESULT
Twenty-two assay results showed mineable numbers. One particular area of that length was trenched uncovering a dome like structure 60 foot in diameter on strike with the sampled areas. Six assay results from this area were: 82.8 g/t, 1 g/t, 8.3 g/t, 100.8 g/t, 9.2 g/t and 9.6 g/t. au. Other areas assays along the sampled area recorded results of 20.9 g/ton to as high as 158 g/t au.
LOOK AT THE HANDCAMP RESULT
Twenty-two assay results showed mineable numbers. One particular area of that length was trenched uncovering a dome like structure 60 foot in diameter on strike with the sampled areas. Six assay results from this area were: 82.8 g/t, 1 g/t, 8.3 g/t, 100.8 g/t, 9.2 g/t and 9.6 g/t. au. Other areas assays along the sampled area recorded results of 20.9 g/ton to as high as 158 g/t au.
Recent RMSL News
- Form NT 10-Q - Notification of inability to timely file Form 10-Q or 10-QSB • Edgar (US Regulatory) • 05/15/2026 03:14:41 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 04/15/2026 09:26:38 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 03/04/2026 08:38:01 PM
- Form NT 10-Q - Notification of inability to timely file Form 10-Q or 10-QSB • Edgar (US Regulatory) • 11/14/2025 07:03:19 PM
- Deltawave(TM) Launch Plan • ACCESS Newswire • 10/01/2025 11:30:00 AM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 05:17:46 PM
