Eye I think its the same project based on what was published in the Oct. FR.
I agree that what Doug was probably saying is that the 8 figures is what they would receive as the initial funding but the complete project would be what greengiant's estimate states.

Field Report; Oct 14 2009

Doug Evans is presently in Sierra Leone setting up operations for the up coming mining season. SGCP is in the process of sending an 8 inch dredge to Sierra Leone we hope to be able to ship the dredge in the next 3 to 4 weeks out of Baltimore Maryland. With the dredge comes a professional dredge operator with over 20 years of experience plus experience in swift water dredging.

The Carbon credit project is moving forward as expected complete survey of 42,500 acres of land is expected to be completed by 10/19/ 2009. Baseline scenario is near completion and project design documents are underway. We hope to have information on the value of the project soon as all pieces are falling in place.