InvestorsHub Logo
Followers 0
Posts 246
Boards Moderated 0
Alias Born 10/05/2007

Re: Sam Dan post# 88

Friday, 11/06/2009 1:18:01 AM

Friday, November 06, 2009 1:18:01 AM

Post# of 1761
<"They will be doing a 43-101 before commencing gold production. Will probably take at least a month">

A month ???

Will it be like the 43-101 they did on Don Ramon ? which wasn't even remotely an NI 43-101. I have posted this here, on a remote message board, that nobody reads, so that the stock will not be hurt by this caca del toro.

***

http://taraminerals.com/Theme/TaraMinerals/files/Reports/Don_Ramon_43-101_July_09.pdf

1.2 Geology and Mineralization

At the Don Roman project, mineralization consists Zn-Pb-Ag metasomatic skarn mineralization developed in a more favorable lithologic unit near the base of an otherwise thick, massive limestone. It is probably genetically related to the nearby Santo Tomas porphyry copper system. The author has inferred that mineralization has developed as irregularly shaped crudely tabular bodies (mantos) largely within this unit and as planar to chimney-like bodies at structural intersections. The favorable zone appears to dip to the northeast at approximately 25 to 35 degrees.

At this time there is no well defined resource which would fit NI-43-101 standards.

1.6 Mineral Resource Estimation

There has been no NI 43-101 compliant resource estimation. There have been some small scale historic resource estimates in the immediate vicinity of the existing workings. While these were useful for exploration purposes, they were not NI 43-10-1 compliant.