InvestorsHub Logo
Followers 55
Posts 3246
Boards Moderated 1
Alias Born 09/20/2007

Re: Play_Chips post# 581

Tuesday, 04/21/2009 11:04:58 AM

Tuesday, April 21, 2009 11:04:58 AM

Post# of 34559
INFRASTRUCTURE

Area built for the Central Base Camp with approximately 1.50 hectares of area, containing: a LFA (X-ray Sorting House) with a Flow Sort recovering diamonds at a 100% level; dormitories, refectories, garage, storage room, infirmary, security lodge, etc. qualified technical and operational staff. 110 volts electrical energy availability 24 hours/day and specific generating groupscapable of generating energy from 220V to 380Volts for garage and LFA special needs, as well as water for housing supplying, LFA, garages, office, with semi artesian wells with capacity of 2500 m3/hour each well – (reservatories of 25,000 and 15,000 liters).