InvestorsHub Logo
Followers 46
Posts 3982
Boards Moderated 0
Alias Born 12/15/2006

Re: jdsgungho post# 87665

Wednesday, 03/25/2009 8:28:36 PM

Wednesday, March 25, 2009 8:28:36 PM

Post# of 107353
Yes, I did see it in the filings, several times I think, under the sections about the types of equipment Deep Down makes.

It certainly makes sense to drop as much as you can on each string, what does it take to reach to bottom 2 hrs, 5 hrs?

Plus the ROV is waiting around through all the down time.

The most recent 10-k
" We have designed and fabricated many different installation tools and equipment over the years. We have been involved in the design of the following equipment to help make installations run as smoothly as possible: steel flying leads, steel flying lead deployment systems, umbilical hardware and termination systems, umbilical bell mouths, lay chutes, rapid deployment cartridges, horizontal drive units, mud mats, flying lead installation and parking frames, umbilical termination assembly stab & hinge over systems, and numerous other pieces of offshore equipment. Our team has vast experience with the installation of flexible and rigid risers and flowlines, umbilicals, flexible and rigid jumpers, steel tube and thermoplastic hose flying leads, pipeline end terminations (“PLETs”) and manifolds."



My posts are my opinions. Always dd to your own comfort level.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KLNG News