Friday, October 31, 2008 10:40:47 AM
Arlene E. read the application into the record.
Greg T. gave a brief summary of the project. He noted it is located in the Biddeford Industrial Park & basically, the applicant needs more space. There is also a subdivision amendment required. Erosion & stormwater plans were submitted & accepted by Jennie Franceschi, Planning Engineer. The Board has seen this as conceptual and there were not many comments at that time on the project. Two waivers requested & required; to allow parking within 10’ of the side lot line and for the placement of loading doors that face a roadway. Staff recommended to grant the waivers. The outstanding issues have all been adequately addressed except one. We did not received the ability to serve letter from Mr. Copeland in our sewer department but we expect that to come in. Two approvals are required, first the subdivision approval. If that is approved, the Board could grant the waivers, & then the Board could grant the site plan permit.
Dave Wade, Trade Center, presented the plan to the Board. This is a 17,000 SF addition to include additional parking and a loading dock. Includes the purchase of approximately ¾ acre area. They are currently working on stormwater with the City. We have received approval from E.I.C. Submitted to DEP the permit by rule information & we haven’t heard anything in 14 days, which is a good thing. He explained the elevations & the rendering he submitted of the plan.
http://tinyurl.com/63c46m
The video portion of the meeting explains the loading area where the trucks will be pulled inside and loaded with a crane system.
Also we have this from jds #msg-32962403
Greg T. gave a brief summary of the project. He noted it is located in the Biddeford Industrial Park & basically, the applicant needs more space. There is also a subdivision amendment required. Erosion & stormwater plans were submitted & accepted by Jennie Franceschi, Planning Engineer. The Board has seen this as conceptual and there were not many comments at that time on the project. Two waivers requested & required; to allow parking within 10’ of the side lot line and for the placement of loading doors that face a roadway. Staff recommended to grant the waivers. The outstanding issues have all been adequately addressed except one. We did not received the ability to serve letter from Mr. Copeland in our sewer department but we expect that to come in. Two approvals are required, first the subdivision approval. If that is approved, the Board could grant the waivers, & then the Board could grant the site plan permit.
Dave Wade, Trade Center, presented the plan to the Board. This is a 17,000 SF addition to include additional parking and a loading dock. Includes the purchase of approximately ¾ acre area. They are currently working on stormwater with the City. We have received approval from E.I.C. Submitted to DEP the permit by rule information & we haven’t heard anything in 14 days, which is a good thing. He explained the elevations & the rendering he submitted of the plan.
http://tinyurl.com/63c46m
The video portion of the meeting explains the loading area where the trucks will be pulled inside and loaded with a crane system.
Also we have this from jds #msg-32962403
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM