Friday, July 25, 2008 6:00:15 PM
sweet vid
Introduction
In June 2008, Deepwater Corrosion Services working in conjunction with Deep Down Inc and Oceaneering Inc performed a cathodic protection retrofit of a fixed platform in two days. This Gulf of Mexico platform is a large 4-leg, 8-skirt pile fixed jacket, located in 720 feet of seawater.
The retrofitted CP system consists of 2 RetroBuoys (impressed current anode sleds) deployed on the seabed 150 to 400 feet outboard of the base of the jacket. Double-armored power cables (1,200 feet long), connect each RetroBuoy to a topside marine transformer-rectifier rated at 450 Amps, The cable is routed across the seabed and through a spare12” J-tube.
Installation Equipment
The installation was carried out aboard Oceaneering’s 315’ X 59’ Dynamically Positioned Intervention Vessel, The Performer. Deep Down managed the RetroBuoy installation utilizing hydraulic Horizontal Drive Units (HDUs) and Reels. Deep Down also supplied various installation hardware including: a combination cable pulling head/armor termination body, custom junction box and a spreader bar for simultaneous RetroBuoy deployment. This installation hardware combined with project management and planning was the key to an efficient, safe deployment.
Description of Installation
Each RetroBuoy was mounted atop a horizontal reel (2 total). With the RetroBuoy secured, the reel is rotated to spool the power cable. The end of each RetroBuoy’s cable was capped with a “bull nose” pulling head. Prior to the cable pull, the J-tube was drifted with a dummy pulling head to ensure there was no major blockage; this also confirmed the actual pulling head would proceed without interference. For deployment, both pulling heads were bolted together thereby requiring only one pull. A wire from a platform-mounted tugger was routed down and out the J-tube and connected to the RetroBuoy pulling head aboard the vessel. (In essence, the platform was directly connected to the dynamically positioned vessel.) As the HDUs payed out power cable, the platform tugger payed out wire-rope until the pulling head emerged from the top of the J-tube. Concurrently, the ROV is stationed at the seabed to monitor the cable touchdown area and J-Tube entry. The pulling head was secured at the top of the J-tube by the platform crew.
Both RetroBuoys were overboarded simultaneously, utilizing a spreader bar, and lowered to the Target Box #1 on the seabed. RetroBuoy #1 was released from rigging. The vessel then lifted RetroBuoy #2 approximately 100 feet above the seabed and used DP to move around the structure to Target Box #2. RetroBuoy #2 was then lowered and de-rigged. This concluded subsea operations.
The entire subsea installation was accomplished in less than 19 hours.
Introduction
In June 2008, Deepwater Corrosion Services working in conjunction with Deep Down Inc and Oceaneering Inc performed a cathodic protection retrofit of a fixed platform in two days. This Gulf of Mexico platform is a large 4-leg, 8-skirt pile fixed jacket, located in 720 feet of seawater.
The retrofitted CP system consists of 2 RetroBuoys (impressed current anode sleds) deployed on the seabed 150 to 400 feet outboard of the base of the jacket. Double-armored power cables (1,200 feet long), connect each RetroBuoy to a topside marine transformer-rectifier rated at 450 Amps, The cable is routed across the seabed and through a spare12” J-tube.
Installation Equipment
The installation was carried out aboard Oceaneering’s 315’ X 59’ Dynamically Positioned Intervention Vessel, The Performer. Deep Down managed the RetroBuoy installation utilizing hydraulic Horizontal Drive Units (HDUs) and Reels. Deep Down also supplied various installation hardware including: a combination cable pulling head/armor termination body, custom junction box and a spreader bar for simultaneous RetroBuoy deployment. This installation hardware combined with project management and planning was the key to an efficient, safe deployment.
Description of Installation
Each RetroBuoy was mounted atop a horizontal reel (2 total). With the RetroBuoy secured, the reel is rotated to spool the power cable. The end of each RetroBuoy’s cable was capped with a “bull nose” pulling head. Prior to the cable pull, the J-tube was drifted with a dummy pulling head to ensure there was no major blockage; this also confirmed the actual pulling head would proceed without interference. For deployment, both pulling heads were bolted together thereby requiring only one pull. A wire from a platform-mounted tugger was routed down and out the J-tube and connected to the RetroBuoy pulling head aboard the vessel. (In essence, the platform was directly connected to the dynamically positioned vessel.) As the HDUs payed out power cable, the platform tugger payed out wire-rope until the pulling head emerged from the top of the J-tube. Concurrently, the ROV is stationed at the seabed to monitor the cable touchdown area and J-Tube entry. The pulling head was secured at the top of the J-tube by the platform crew.
Both RetroBuoys were overboarded simultaneously, utilizing a spreader bar, and lowered to the Target Box #1 on the seabed. RetroBuoy #1 was released from rigging. The vessel then lifted RetroBuoy #2 approximately 100 feet above the seabed and used DP to move around the structure to Target Box #2. RetroBuoy #2 was then lowered and de-rigged. This concluded subsea operations.
The entire subsea installation was accomplished in less than 19 hours.
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM