The integrated bridge system (consisting of dynamic positioning system, radar, ECDIS - Electronic Chart Display & Information System, Helm & Conning controls, Route planning, autopilot, CAS -Collision Avoidance System, and the Data Recorder - the "black box" for ships in case of accident) was provided by Kongsberg and is primarily housed in the pilothouse with some components located elsewhere in the vessel. Marinette Marine built the pilothouse. Electrowave provided multiple MPCMS (Machinery Plant Control & Monitoring System) terminals for mounting inside and integration with the Kongsberg consoles. Basically, the IBS is the radar/navigation/steering control side.
The MPCMS is primarily housed in a large console assembly located in the Engineering Control Center. ABB provided terminals for mounting in the MPCMS Consoles for Azipod Control and integration. The MPCMS would control and monitor systems such as Main Engines, Generators, Electrical Power Distribution, Damage Control, Fire/smoke alarms, Firepumps, Flooding Alarms, Fresh Water Production/storage/transfer, Sewage Plant, Tank Level and Ballasting, and much more. Basically MPCMS is control of everything that makes the ship function.
The ABB provided Azipod control section would control the Azipods (pitch, direction, speed) and the frequency Variable Frequency Drive units that control them.
Electrowave did not provide the pilothouse but they did provide the MPCMS and other systems that all the other systems "talk" to each other through. There is no one control system on the ship but is rather "a system of systems" with MPCMS sitting in the center.
Besides the typo (PMCMS) the headline is also not correct.
The MPCMS is primarily housed in a large console assembly located in the Engineering Control Center. ABB provided terminals for mounting in the MPCMS Consoles for Azipod Control and integration. The MPCMS would control and monitor systems such as Main Engines, Generators, Electrical Power Distribution, Damage Control, Fire/smoke alarms, Firepumps, Flooding Alarms, Fresh Water Production/storage/transfer, Sewage Plant, Tank Level and Ballasting, and much more. Basically MPCMS is control of everything that makes the ship function.
The ABB provided Azipod control section would control the Azipods (pitch, direction, speed) and the frequency Variable Frequency Drive units that control them.
Electrowave did not provide the pilothouse but they did provide the MPCMS and other systems that all the other systems "talk" to each other through. There is no one control system on the ship but is rather "a system of systems" with MPCMS sitting in the center.
Besides the typo (PMCMS) the headline is also not correct.
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM