On April 17, Deep Down announced a definitive agreement to purchase all of the outstanding capital stock of Flotation Technologies, Inc. Flotation recently introduced its patent pending CoreTec(TM) drilling riser buoyancy modules, which Deep Down believes can become the industry standard for ultra deepwater applications. Subject to completion of this acquisition, it is expected that the drilling riser flotation systems to be provided under the Delba letter of intent will be manufactured by Flotation Technologies in Biddeford, Maine. Deep Down will handle installation of the drilling riser buoyancy.
UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION:
http://www.gomr.mms.gov/homepg/regulate/regs/ntls/2007NTLs/07-g14.pdf
Under 30 CFR 250.910(b)(1)(i) and (2)(i), pipeline risers connected to floating platforms are subject to the platform verification program as associated structures. The Minerals Management Service (MMS) Gulf of Mexico OCS Region (GOMR) has determined that new pipeline risers are subject to a separate verification process that necessitates the use of an independent Certified Verification Agent (CVA) specifically for the pipeline riser. These pipeline risers are a critical
component of any floating platform proposal and must meet stringent requirements for design, fabrication, and installation. Accordingly, the MMS GOMR has developed the following guidelines for the pipeline riser verification process as part of the platform verification program.
Verification Requirements
1. Pursuant to 30 CFR 250.916(b)(2)(i), a proposed pipeline riser for a floating facility must
undergo design verification.
2. Pursuant to 30 CFR 250.917(b)(2)(i), a proposed pipeline riser for a floating facility must
undergo fabrication verification for the initial fabrication of a riser. However, fabrication
verification is not required if
a. The proposed riser is identical in design to an existing riser on the same facility;
b. The fabrication verification plan for the existing riser has been approved by the MMS
GOMR;
c. The proposed riser will be designed, fabricated, and installed by the same lessee,
lease operator, or pipeline right-of-way (ROW) holder as the existing riser; and
d. The outside diameter of the proposed riser is 8 ⅝ inches or less.
3. Pursuant to 30 CFR 250.918(b)(3)(ii), a proposed pipeline riser for a floating facility
must undergo installation verification for the initial installation of a riser. However, installation
verification is not required if
2
a. The proposed riser is identical in design to an existing riser on the same facility;
b. The installation verification plan for the existing riser has approved by the MMS
GOMR;
c. The proposed riser will be designed, fabricated, and installed by the same lessee,
lease operator, or pipeline ROW holder as the existing riser; and
d. The outside diameter of the proposed riser is 8 ⅝ inches or less.
On April 17, Deep Down announced a definitive agreement to purchase all of the outstanding capital stock of Flotation Technologies, Inc. Flotation recently introduced its patent pending CoreTec(TM) drilling riser buoyancy modules, which Deep Down believes can become the industry standard for ultra deepwater applications. Subject to completion of this acquisition, it is expected that the drilling riser flotation systems to be provided under the Delba letter of intent will be manufactured by Flotation Technologies in Biddeford, Maine. Deep Down will handle installation of the drilling riser buoyancy.
UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION:
http://www.gomr.mms.gov/homepg/regulate/regs/ntls/2007NTLs/07-g14.pdf
Under 30 CFR 250.910(b)(1)(i) and (2)(i), pipeline risers connected to floating platforms are subject to the platform verification program as associated structures. The Minerals Management Service (MMS) Gulf of Mexico OCS Region (GOMR) has determined that new pipeline risers are subject to a separate verification process that necessitates the use of an independent Certified Verification Agent (CVA) specifically for the pipeline riser. These pipeline risers are a critical
component of any floating platform proposal and must meet stringent requirements for design, fabrication, and installation. Accordingly, the MMS GOMR has developed the following guidelines for the pipeline riser verification process as part of the platform verification program.
Verification Requirements
1. Pursuant to 30 CFR 250.916(b)(2)(i), a proposed pipeline riser for a floating facility must
undergo design verification.
2. Pursuant to 30 CFR 250.917(b)(2)(i), a proposed pipeline riser for a floating facility must
undergo fabrication verification for the initial fabrication of a riser. However, fabrication
verification is not required if
a. The proposed riser is identical in design to an existing riser on the same facility;
b. The fabrication verification plan for the existing riser has been approved by the MMS
GOMR;
c. The proposed riser will be designed, fabricated, and installed by the same lessee,
lease operator, or pipeline right-of-way (ROW) holder as the existing riser; and
d. The outside diameter of the proposed riser is 8 ⅝ inches or less.
3. Pursuant to 30 CFR 250.918(b)(3)(ii), a proposed pipeline riser for a floating facility
must undergo installation verification for the initial installation of a riser. However, installation
verification is not required if
2
a. The proposed riser is identical in design to an existing riser on the same facility;
b. The installation verification plan for the existing riser has approved by the MMS
GOMR;
c. The proposed riser will be designed, fabricated, and installed by the same lessee,
lease operator, or pipeline ROW holder as the existing riser; and
d. The outside diameter of the proposed riser is 8 ⅝ inches or less.
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM