News Focus
News Focus
Followers 64
Posts 6445
Boards Moderated 1
Alias Born 02/09/2007

Re: None

Thursday, 05/22/2008 10:55:01 AM

Thursday, May 22, 2008 10:55:01 AM

Post# of 107353
Meanwhile the dump trucks (6 of them) are delivering gravel to the West yard area at a rate of 18 loads and hour. Like clockwork even in a rain shower. Their time on site to dump and leave is 3 minutes leaving 17 minutes to transit and reload. The source must be pretty close.

Joe Smith beat me to the punch (again) on the SAM progress fitting the pressure cylinders. I think the items nearby are for flaring and bending stainless high pressure lines. The stainless lines are also visible in the aisle of the assembly bay. They look like the same material that is used in the flying leads connecting to the J-plates.

It seems a bit rough lately.


Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KLNG News