Wednesday, April 16, 2008 8:56:58 PM
mr GB, if we do work for a vendor who is connected to PBR, then in an indirect way PBR becomes a client imo. i think this is in fact the case. happy days... :)
http://investorshub.advfn.com/boards/read_msg.asp?message_id=26402152
NEWS - Deep Down, Inc. Ships Three BS Latchers
HOUSTON, Jan 30, 2008 /PRNewswire-FirstCall via COMTEX/ -- Deep Down, Inc. (DPDW) announced today that three Bend Stiffener ("BS") Latchers, for the BC-10 project, were shipped to Singapore. These BS Latchers will be installed on the Client's Floating Production, Storage and Offloading vessel ("FPSO") which will be bound for Brazil upon its completion. An FPSO is a type of floating tank system used by the offshore oil and gas industry. It is designed to receive oil or gas produced from a nearby platform(s) and store it until the oil or gas can be offloaded onto waiting tankers, or sent through a pipeline.
The BS Latcher is a proprietary Deep Down design which offers its clients significant cost savings as compared to many of its competitors' products. These cost savings arise principally out of the unique quick-release and locking mechanism which can be engaged by a single ROV without any need for divers for any phase of its deployment. As bend stiffeners get larger and heavier, it is also important to note that the bend stiffener can be carried behind the bullnose of the Deep Down BS Latcher and engaged into the mating bellmouth quickly and efficiently. Upon completion, the bend stiffener can be released to allow the bullnose and umbilical to be pulled up through the remaining length of the I-tube and hung off at the topside hang-off flange.
"The Deep Down design has handled high load transfers for very high bending moments of up to 350,000 foot pounds. As umbilicals, and attached bend stiffeners, are subjected to higher cyclic loading in ultra deepwater developments, these bending moments will increase. Our BS Latchers can be engineered and designed to handle these ever-increasing loads and bending moments. It is gratifying that our client has chosen to use our services in an international installation in Singapore on their very first owned FPSO, which is to be operated in their very first development in Brazil," says Ronald E. Smith, President & CEO of Deep Down. "We continue to strive to engineer innovative solutions to save our clients time and money in the continuing search for oil and gas reserves," he concluded.
http://investorshub.advfn.com/boards/read_msg.asp?message_id=26402152
NEWS - Deep Down, Inc. Ships Three BS Latchers
HOUSTON, Jan 30, 2008 /PRNewswire-FirstCall via COMTEX/ -- Deep Down, Inc. (DPDW) announced today that three Bend Stiffener ("BS") Latchers, for the BC-10 project, were shipped to Singapore. These BS Latchers will be installed on the Client's Floating Production, Storage and Offloading vessel ("FPSO") which will be bound for Brazil upon its completion. An FPSO is a type of floating tank system used by the offshore oil and gas industry. It is designed to receive oil or gas produced from a nearby platform(s) and store it until the oil or gas can be offloaded onto waiting tankers, or sent through a pipeline.
The BS Latcher is a proprietary Deep Down design which offers its clients significant cost savings as compared to many of its competitors' products. These cost savings arise principally out of the unique quick-release and locking mechanism which can be engaged by a single ROV without any need for divers for any phase of its deployment. As bend stiffeners get larger and heavier, it is also important to note that the bend stiffener can be carried behind the bullnose of the Deep Down BS Latcher and engaged into the mating bellmouth quickly and efficiently. Upon completion, the bend stiffener can be released to allow the bullnose and umbilical to be pulled up through the remaining length of the I-tube and hung off at the topside hang-off flange.
"The Deep Down design has handled high load transfers for very high bending moments of up to 350,000 foot pounds. As umbilicals, and attached bend stiffeners, are subjected to higher cyclic loading in ultra deepwater developments, these bending moments will increase. Our BS Latchers can be engineered and designed to handle these ever-increasing loads and bending moments. It is gratifying that our client has chosen to use our services in an international installation in Singapore on their very first owned FPSO, which is to be operated in their very first development in Brazil," says Ronald E. Smith, President & CEO of Deep Down. "We continue to strive to engineer innovative solutions to save our clients time and money in the continuing search for oil and gas reserves," he concluded.
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM
