Monday, February 18, 2008 3:45:09 PM
Email from Haag about mass production:
The Proteus was designed to use parts that could be easily fabricated either in-house or outsourced. The problem in the past has been the lead time for special machined gears and other such high tolerance machined parts taking six-months and sometimes more, to receive.
Deep Down has always had the ability to mass produce things here when needed. The facility is an ISO 9001 compliant operation, laid out for large scale process work flow. So, our ability to produce has never been a huge issue. Rather, in our new product designs, attention has also been given to the parts needed and how to overcome such long lead time items through both engineering and work flow. This allows us to more quickly meet customers' turn-around time demands, and increase sales of our technology.
Please feel to contact me anytime should you require more information.
Regards,
--Steve Haag
investor relations
Deep Down, Inc. (OTCBB: DPDW)
ir@deepdowninc.com
281-862-2201 (O)
281-862-2522 (F)
The Proteus was designed to use parts that could be easily fabricated either in-house or outsourced. The problem in the past has been the lead time for special machined gears and other such high tolerance machined parts taking six-months and sometimes more, to receive.
Deep Down has always had the ability to mass produce things here when needed. The facility is an ISO 9001 compliant operation, laid out for large scale process work flow. So, our ability to produce has never been a huge issue. Rather, in our new product designs, attention has also been given to the parts needed and how to overcome such long lead time items through both engineering and work flow. This allows us to more quickly meet customers' turn-around time demands, and increase sales of our technology.
Please feel to contact me anytime should you require more information.
Regards,
--Steve Haag
investor relations
Deep Down, Inc. (OTCBB: DPDW)
ir@deepdowninc.com
281-862-2201 (O)
281-862-2522 (F)
"Freedom is secured not by the fulfilling of one's desires, but by the removal of desire." Epictetus
This post is in my ignorant opinion. I have been wrong many times before.
Recent KLNG News
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 04/14/2026 08:07:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 04/01/2026 06:27:31 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 03/31/2026 01:37:45 PM
- KOIL Energy Reports Fourth Quarter and Full Year 2025 Results • GlobeNewswire Inc. • 03/31/2026 12:30:00 PM
- KOIL Energy Solutions Announces Dates for Fourth Quarter and Full Year 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 03/26/2026 07:24:02 PM
- KOIL Energy Wins Significant Contract Offshore West Africa • GlobeNewswire Inc. • 03/11/2026 06:30:52 PM
- KOIL Energy Secures Significant Contract with U.S. Oil Company to Deliver an Integrated Subsea Distribution System • GlobeNewswire Inc. • 01/12/2026 03:50:00 PM
- Form SCHEDULE 13G/A - Statement of Beneficial Ownership by Certain Investors: [Amend] • Edgar (US Regulatory) • 01/09/2026 07:31:57 PM
- KOIL Energy Awarded Significant Fabrication Contract • GlobeNewswire Inc. • 01/06/2026 01:50:00 PM
- KOIL Energy to Present at Sidoti’s Year-End Virtual Investor Conference December 10-11 • GlobeNewswire Inc. • 12/09/2025 10:22:27 PM
- Sidoti Events, LLC's Year-End Virtual Investor Conference • ACCESS Newswire • 12/09/2025 05:48:00 PM
- KOIL Energy Reports Third Quarter 2025 Results • GlobeNewswire Inc. • 11/14/2025 01:30:00 PM
- UPDATE – KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 10:38:07 PM
- KOIL Energy Solutions Schedules Q3 2025 Earnings Release and Conference Call • GlobeNewswire Inc. • 11/11/2025 03:40:08 PM
- KOIL Energy Celebrates Beacon Offshore Energy’s First Oil in Shenandoah Field • GlobeNewswire Inc. • 10/09/2025 04:36:42 PM
- KOIL Energy Awarded Significant Contract to Deliver Subsea Distribution Equipment for US Project • GlobeNewswire Inc. • 10/08/2025 03:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 09/15/2025 09:13:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 09/12/2025 02:02:38 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2025 12:30:44 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 08/04/2025 04:37:06 PM
