InvestorsHub Logo
Followers 21
Posts 14802
Boards Moderated 0
Alias Born 03/17/2003

Re: Mysef post# 20362

Friday, 12/12/2003 3:02:16 PM

Friday, December 12, 2003 3:02:16 PM

Post# of 97595
If AMD was having all of these fab problems the Intel employees and contractors continue to repeat, I don't think Dirk would be out in the field.

Last I heard Myer was VP of Engineering. When did he move
over to Operations? Was this voluntary or was he demoted
because of Opteron's massive schedule slip and failure to
achieve its introductory clock rate target?

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent AMD News