News Focus
News Focus
Followers 12
Posts 1038
Boards Moderated 0
Alias Born 02/04/2023

Re: None

Thursday, 02/19/2026 7:13:13 AM

Thursday, February 19, 2026 7:13:13 AM

Post# of 59743
Nice imagery and analysis from this firm not just for the site of the explosion but for the visible segment of the line as well.
Plugging the coordinates from the images into Google Map confirms that this is the location "Very close to Transco Station 44."

https://blog.synmax.com/vulcan-exclusive/infrastructure-watch-delfin-lng-pipeline-drone-damage-assessment

Assessment:
Confirmed: Localized damage at the blast site consistent with the reported pipeline explosion. Damage is contained to a single point along the route. Surrounding pipeline infrastructure appears intact based on visual and thermal aerial inspection.

Physical Visibility: While the main pipeline is buried, appurtenant facilities such as a mainline block valve and blowdown site are visible just south of Louisiana Highway 82, near the approach to Station 44.

Total Onshore Segment: The total length of the reactivated onshore portion of the UTOS pipeline, from the mean high-water mark to the station, is approximately 1.1 miles

Bullish
Bullish
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent TGLO News