| Followers | 18 |
| Posts | 8573 |
| Boards Moderated | 0 |
| Alias Born | 01/16/2026 |
Wednesday, February 04, 2026 8:15:13 AM
Brenmiller Energy Provides Tempo Project Operational Update
February 4, 2026 8:02 AM
ACCESS Newswire
Electrical Works Completed; Commissioning Expected to Begin Mid-February
TEL AVIV, IL / ACCESS Newswire / February 4, 2026 / Brenmiller Energy Ltd. (NASDAQ:BNRG) ("Brenmiller", "Brenmiller Energy" or the "Company"), a provider of thermal energy storage ("TES") solutions for industrial and utility customers, today provided an operational update on its flagship project for Tempo Beverages Ltd. ("Tempo").
The Company announced that electrical works at the Tempo site have been completed, marking a major milestone in the project's development and enabling full electrification of the TES system.
With the completion of this phase, the TES system is now electrically connected and capable of supporting large-scale electric charging, converting electricity into dispatchable industrial heat. The electrical scope included installation and integration of the system's cabling, transmission infrastructure, switching equipment, and heating components.
Following completion of the electrical works, commissioning activities are expected to begin in mid-February 2026.
"The completion of the electrical works at Tempo is a major milestone for the project," said Avi Brenmiller, Chief Executive Officer of Brenmiller Energy. "This step enables full electrification of the thermal energy storage system and marks the transition from construction into the final stages ahead of commissioning."
About the Tempo Project
The Tempo Project is Brenmiller's flagship industrial deployment and a major milestone in the Company's evolution from long-term technology development to scaled commercial execution.
The Tempo project is designed to deliver the full replacement of 100% of the site's natural gas boiler-based heat production through Brenmiller's thermal energy storage solution. The project includes a 32 megawatt-hour TES installation engineered to supply continuous industrial process heat, eliminating 6,200 tons of CO2 annually.
The Tempo project represents the culmination of more than 15 years of technology development, translating Brenmiller's patented TES platform into a full-scale industrial reference site. The Company expects the project to serve as an exceptional demonstration for customers, partners, and policymakers, showcasing how thermal energy storage can enable continuous industrial production without routine dependence on fossil fuel combustion.
Brenmiller views the Tempo project as a foundational step toward realizing its growing commercial pipeline, providing a validated template for repeatable deployment of the Company's TES solutions across industrial applications globally.
About Brenmiller Energy Ltd.
Brenmiller Energy (NASDAQ:BNRG) provides TES solutions that enable industrial and utility customers to decarbonize heat, improve energy flexibility, and integrate renewable electricity. The Company's bGen™ systems convert electricity into dispatchable industrial heat, supporting electrification and emissions reduction across a range of applications.
Forward-Looking Statements
This press release contains "forward-looking statements" within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 and other federal securities laws. Statements that are not statements of historical fact may be deemed to be forward-looking statements. For example, the Company is using forward-looking statements when discussing full electrification of the Company's TES system at the Tempo project; that the TES system is capable of supporting large-scale electric charging, converting electricity into dispatchable industrial heat; and that commissioning activities are expected to begin in mid-February 2026. Without limiting the generality of the foregoing, words such as "plan," "project," "potential," "seek," "may," "will," "expect," "believe," "anticipate," "intend," "could," "estimate" or "continue" are intended to identify forward-looking statements. Readers are cautioned that certain important factors may affect the Company's actual results and could cause such results to differ materially from any forward-looking statements that may be made in this press release. Factors that may affect the Company's results include, but are not limited to: the Company's planned level of revenues and capital expenditures; risks associated with the adequacy of existing cash resources; the demand for and market acceptance of our products; impact of competitive products and prices; product development, commercialization or technological difficulties; the success or failure of negotiations; trade, legal, social and economic risks; and political, economic and military instability in the Middle East, specifically in Israel. The forward-looking statements contained or implied in this press release are subject to other risks and uncertainties, many of which are beyond the control of the Company, including those set forth in the Risk Factors section of the Company's Annual Report on Form 20-F for the year ended December 31, 2024 filed with the U.S. Securities and Exchange Commission ("SEC") on March 4, 2025, which is available on the SEC's website, www.sec.gov. The Company undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.
Contact: investors@bren-energy.com

SOURCE: Brenmiller Energy
View the original press release on ACCESS NewswireOriginal: Brenmiller Energy Provides Tempo Project Operational Update
Recent BNRG News
- Brenmiller Energy completes Tempo Beverages thermal storage project • IH Market News • 03/12/2026 03:52:56 PM
- Brenmiller Energy CEO Avi Brenmiller Issues Letter to Shareholders • Newsfile • 03/12/2026 12:07:00 PM
- As European Gas Prices Double, Brenmiller Energy Accelerates Clean Heat Strategy • Newsfile • 03/10/2026 12:07:00 PM
- Form EFFECT - Notice of Effectiveness • Edgar (US Regulatory) • 03/05/2026 05:15:17 AM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 03/02/2026 02:04:49 PM
- Brenmiller Energy Completes Construction of its First Commercial Scale Boiler Replacement Project, Advancing 360BNRG Strategy • Newsfile • 03/02/2026 01:00:00 PM
- Form F-3 - Registration statement by foreign private issuers • Edgar (US Regulatory) • 02/23/2026 09:46:47 PM
- Brenmiller Energy and Rock Energy Storage to Present on Integrating SMRs with Thermal Energy Storage at IDEA Campus 2026 • ACCESS Newswire • 02/18/2026 01:30:00 PM
- Brenmiller Energy Marks Construction Milestone for Wolfson Medical Center Clean Heat Project • ACCESS Newswire • 02/17/2026 01:30:00 PM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 02/13/2026 09:05:02 PM
- Brenmiller Energy Executes on Technology Roadmap with Early Launch of bGen ONE(TM) • ACCESS Newswire • 02/11/2026 01:30:00 PM
- Brenmiller Energy Provides Tempo Project Operational Update • ACCESS Newswire • 02/04/2026 01:02:00 PM
- Brenmiller Energy Expands Offering to Supply Clean Heat and Power to Industrial Customers by the Launch of 'BNRG360' Integrated Energy Platform for Customers, Marking a Strategic Evolution to an Integrated Energy Company • ACCESS Newswire • 01/22/2026 01:00:00 PM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 01/21/2026 10:07:25 PM
- Brenmiller Energy Ltd. Announces Expected Implementation of 7-for-1 Reverse Share Split • ACCESS Newswire • 01/21/2026 10:00:00 PM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 01/13/2026 12:19:32 PM
- Form F-3 - Registration statement by foreign private issuers • Edgar (US Regulatory) • 01/09/2026 09:05:34 PM
- Brenmiller Energy Founder & CEO Avi Brenmiller Wins Merage Industry Leader Award • ACCESS Newswire • 01/09/2026 01:30:00 PM
- Brenmiller Energy CEO Avi Brenmiller Issues Year-End Letter to Shareholders • ACCESS Newswire • 12/22/2025 12:00:00 PM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 12/16/2025 09:10:00 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 12/11/2025 09:32:56 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 12/11/2025 09:22:57 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 12/11/2025 09:19:03 PM
- Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16] • Edgar (US Regulatory) • 12/04/2025 10:15:01 PM
Exxe Group Advances Platform Strategy and Share Structure Reduction Following Strategic Meetings • AXXA • Mar 11, 2026 1:03 PM
DRCR Pushes Forward With Implementation of 2026 Business Plan • DRCR • Mar 11, 2026 12:26 PM
Record Gold Prices Reshape Opportunities for Emerging Producers • LFLR • Mar 11, 2026 9:00 AM
C2 Blockchain Reports 803 Million DOG (Bitcoin) Holdings Following Strategic Accumulation of Bitcoin-Native Digital Assets • CBLO • Mar 10, 2026 8:00 AM
RENI Completes Due Diligence on Target Acquisition; Confirms Strong Asset Base and Operational Performance • RENI • Mar 5, 2026 10:15 AM
BlackStar Engages in Talks with U.S. Senate Banking Committee Team Covering the Digital Asset Market Clarity Act • BEGI • Mar 4, 2026 4:47 PM


