News Focus
News Focus
Followers 2
Posts 93
Boards Moderated 0
Alias Born 11/19/2024

Re: None

Monday, 11/24/2025 5:27:53 PM

Monday, November 24, 2025 5:27:53 PM

Post# of 731
$NUAI just entered a definitive purchase & sale agreement to acquire 203 more contiguous acres in West Texas — expanding the Texas Critical Data Centers (TCDC) AI campus to a massive 438 acres.

This is the real pivot from concept to execution. READ MORE: https://yhoo.it/4punxbw

Here’s what’s happening:

• TCDC is NUAI’s 50/50 JV with Sharon AI, Inc.

• New acreage pushes the site toward a multi-phase, multi-gigawatt AI + HPC campus engineered to scale well beyond 1 GW

• Located outside Odessa with prime access to:?– High-capacity fiber routes?– Major intrastate natural gas transmission lines?– CO2 pipeline corridors

• These connections shorten development timelines + tighten project economics

• Engineering, master planning, interconnection studies, and civil development are already underway

• Phase 1 construction begins in 2026

• Site is being built for long-duration, efficient, environmentally responsible energy solutions

• Designed with optionality for CCUS (carbon capture, utilization & storage)

• Expected to generate high-value recurring revenue via long-term data-center leases, power sales, and flexible commercial structures

• Aligns with New Era’s larger strategy — including the recently announced 7 GW New Mexico AI data-center land position

CEO E. Will Gray II says the 438-acre expansion is a major step toward building a vertically integrated, multi-gigawatt platform where “energy and compute are inseparable drivers of long-term value.”

Bottom line: $NUAI isn’t talking about the AI future — they’re building the infrastructure that powers it.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NUAI News