Thursday, October 30, 2025 11:13:21 AM
Pulsar Helium Announces Jetstream #3 Encounters
Gas With Near-1,000 psi Bottom-Hole Pressure
2025-10-30
THIS ANNOUNCEMENT AND THE INFORMATION CONTAINED HEREIN IS RESTRICTED AND IS NOT FOR RELEASE,
PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM AUSTRALIA,
JAPAN OR THE REPUBLIC OF SOUTH AFRICA OR TO BE TRANSMITTED, DISTRIBUTED TO, OR SENT BY, ANY NATIONAL
OR RESIDENT OR CITIZEN OF ANY SUCH COUNTRIES OR ANY OTHER JURISDICTION IN WHICH SUCH RELEASE,
PUBLICATION OR DISTRIBUTION MAY CONTRAVENE LOCAL SECURITIES LAWS OR REGULATIONS.
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF THE UK VERSION OF
REGULATION (EU) NO. 596/2014 ON MARKET ABUSE, AS IT FORMS PART OF UK DOMESTIC LAW BY VIRTUE OF THE
EUROPEAN UNION (WITHDRAWAL) ACT 2018, AND REGULATION (EU) NO. 596/2014 ON MARKET ABUSE.
UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN
THE PUBLIC DOMAIN AND SUCH PERSONS SHALL THEREFORE CEASE TO BE IN POSSESSION OF INSIDE
INFORMATION
CASCAIS, Portugal, Oct. 30, 2025 (GLOBE NEWSWIRE) --
Pulsar Helium Inc. (AIM: PLSR, TSXV: PLSR, OTCQB: PSRHF) (“Pulsar” or the “Company”), a leading helium exploration and development company, is pleased to announce a major milestone at its agship Topaz Project in Minnesota.
The Jetstream #3 well commenced drilling on October 17 and has encountered pressurized gas with a calculated bottom-hole pressure of approximately 960 psi, underscoring a highly charged gas reservoir. This development marks a signicant step forward in the ongoing drilling campaign, building on the success of the earlier Jetstream
#1 and #2 wells and conrming the continuity of the helium-rich system.
Highlights:
Location: Jetstream #3 is located 0.6 miles (~950 meters) northeast of Jetstream #1 at the Topaz heliumAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
project in Minnesota.
Pressurized gas zones: Jetstream #3 intersected two gas-bearing intervals at approximately 1,717 (523 meters) and 2,036 feet (621 meters) depth, with bottom-hole pressure estimated at ~960 psi at 2,167 feet (661 meters), which is the depth at the time of writing this news release (and is subject to change when the hole is deepened and nal bottom hole and well-head pressures are obtained when total depth is achieved). This
strong pressure reading indicates a robust, pressurized reservoir at the well location, a major validation of the Topaz eld’s potential. For comparison, Jetstream #1 had a bottom hole pressure of 185 psi when drilled in 2024, and Jetstream #2 had a bottom hole pressure of 205 psi when drilled in 2025.
Advancing drilling operations: Jetstream #3 has a planned total depth of ~3,500 feet (1,067 meters) and is being drilled using the coring method with a hole diameter of 3.8 inches (96 mm).
Visible gas: Drilling personnel observed gas bubbling in the drilling mud returns at surface during pipe connections. This indicates an active gas inux from the formation while drilling is underway.
Next steps, testing and analysis: Upon reaching total depth, Jetstream #3 will undergo comprehensive evaluation. A suite of open-hole wireline logs will be run to collect detailed geological and petrophysical data, an optical televiewer will be used to image the well-bore wall geology, followed by a proposed controlled ow- testing and pressure build-up program to measure well deliverability. All core and gas samples will be sent for laboratory analysis to determine gas composition and helium concentrations, including testing for the rare
helium-3 isotope discovered in Jetstream #1.
Thomas Abraham-James, President & CEO of Pulsar, commented:
“Encountering such strong gas pressure at Jetstream #3 is extremely encouraging for our team. A near-1,000 psi bottom-hole pressure suggests we have a highly charged reservoir at this location. This outcome not only validates the geological model we built from Jetstream #1 and #2, but also boosts our condence as we continue drilling and begin the testing phase. We will proceed carefully to collect comprehensive data, including gas samples for lab analysis, to fully understand the reservoir’s characteristics. It’s an exciting milestone for Pulsar as we advance Topaz toward becoming a leading primary helium project in North America.”
Jetstream #3 Well Update
Jetstream #3, the rst well in Pulsar’s new multi-well program at Topaz, was spudded on October 17 . The well encountered a gas show at ~1,717 feet vertical depth and again at ~2,036 feet, within 100 vertical feet of the thAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
interpreted depth of the known helium-bearing zone identied in Jetstream #1. Upon penetrating these intervals, a signicant inux of gas was observed, and bottom-hole pressure was calculated at ~960 psi at 2,167 feet. This pressure level is a strong indicator of a pressurized reservoir but is subject to change as the hole is deepened and final bottom hole and well-head pressure readings are obtained. The presence of pressurized gas at such depth is a major milestone for the project, conrming that the targeted formations are charged with gas as anticipated.
Drilling is ongoing on a 24-hour schedule with rotating crews. Jetstream #3 has currently surpassed 2,167 feet of depth and continues toward the planned total depth of 3,500 feet. The well is being drilled using continuous HQ core drilling (large-diameter core of ~63.5 mm) to maximize sample recovery. This drilling method is providing abundant physical core samples for geological analysis while maintaining ecient progress. Notably, gas is bubbling through the drill mud while drilling and becomes more evident when a new drill pipe connection is made.
Once Jetstream #3 reaches total depth, Pulsar will initiate a comprehensive downhole evaluation program. This includes a suite of open-hole wireline logs, ow testing and pressure build-up analysis on the well. Concurrent with field testing, core and gas samples from Jetstream #3 will undergo thorough laboratory analysis. The lab program
will determine the gas composition and exact helium content of the samples. Importantly, the analysis will include assays for helium-3, a rare isotope of helium, given that helium-3 was previously detected in the Topaz reservoir at notable levels (refer to News Release dated October 1, 2025). The Company is eager to see if Jetstream #3 exhibits a
similar helium-3 signature, which would further underscore the unique character and value of the Topaz helium discovery.
About the Topaz Project
The Topaz project is located in northern Minnesota, USA, where Pulsar is the rst mover and holds exclusive leases.
Drilling at the Jetstream #1 appraisal well reached a total depth (“TD”) of 5,100 feet (1,555 meters) in January 2025, successfully penetrating the entire interpreted helium-bearing reservoir and beyond. Drilling of the Jetstream #2 appraisal well was completed on February 1, 2025, reaching a TD of 5,638 feet (1,718 meters). In August 2025, the
Jetstream #1 well was successfully ow-tested using a wellhead compressor, delivering a peak gas ow rate of approximately 1.3 million cubic feet per day with a sustained ow of 7–8% helium (as helium-4). Recent laboratory analyses have also conrmed the presence of helium-3 in measurable concentrations, representing one of the highest naturally occurring helium-3 values publicly reported in a terrestrial gas reservoir. The forthcoming multi-well drilling campaign will build on these results to expand Pulsar’s understanding of the reservoir and advance Topaz toward development.
On behalf Pulsar Helium Inc.AIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
“Thomas Abraham-James”
President, CEO and Director
Further Information:
Pulsar Helium Inc.
connect@pulsarhelium.com
+ 1 (218) 203-5301 (USA/Canada)
+44 (0) 2033 55 9889 (United Kingdom)
https://pulsarhelium.com
https://ca.linkedin.com/company/pulsar-helium-inc.
Yellow Jersey PR Limited
(Financial PR)
Charles Goodwin / Annabelle Wills
+44 777 5194 357
pulsarhelium@yellowjerseypr.com
Strand Hanson Limited
(Nominated & Financial Adviser, and Joint Broker)
Ritchie Balmer / Rob Patrick / Richard Johnson
+44 (0) 207 409 3494
OAK Securities*
(Joint Broker)
Richard McGlashan / Mungo Sheehan
+44 7879 646641 / +44 7788 266844
richard.mcglashan@oak-securities.com / mungo.sheehan@oak-securities.com
*OAK Securities is the trading name of Merlin Partners LLP, a rm incorporated in the United Kingdom and
regulated by the UK Financial Conduct Authority.
About Pulsar Helium Inc.
Pulsar Helium Inc. is a publicly traded company quoted on the AIM market of the London Stock Exchange and listed
on the TSX Venture Exchange with the ticker PLSR, as well as on the OTCQB with the ticker PSRHF. Pulsar's portfolioAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
consists of its agship Topaz helium project in Minnesota, USA, and the Tunu helium project in Greenland. Pulsar is
the rst mover in both locations with primary helium occurrences not associated with the production of
hydrocarbons identied at each.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is dened in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Qualied Person Signo
In accordance with the AIM Note for Mining and Oil and Gas Companies, the Company discloses that Brad Cage, VP
Engineering and Ocer of the Company has reviewed the technical information contained herein. Mr. Cage has
approximately 25 years in the oil and gas industry, is a member of the Society of Petroleum Engineers and is a
licenced professional petroleum engineer in Oklahoma, USA.
Forward-Looking Statements
This news release contains forward-looking information within the meaning of Canadian securities legislation
(collectively, "forward-looking statements") that relate to the Company's current expectations and views of future
events. Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives,
assumptions or future events or performance (often, but not always, through the use of words or phrases such as
"will likely result", "are expected to", "expects", "will continue", "is anticipated", "anticipates", "believes", "estimated",
"intends", "plans", "forecast", "projection", "strategy", "objective" and "outlook") are not historical facts and may be
forward-looking statements. Forward-looking statements herein include, but are not limited to, statements relating
to the statements regarding bringing the Topaz project to production, anticipated full plant construction contract in
2026, nal investment decision being made in 2026, the potential impact of the drill results, ow testing and
pressure testing on the next iteration of the resource estimate; the potential of CO and/or Helium-3 as a valuable
by-product of the Company’s future helium production; and the potential for future wells. Forward-looking
statements may involve estimates and are based upon assumptions made by management of the Company,
including, but not limited to, the Company's capital cost estimates, management's expectations regarding the
availability of capital to fund the Company's future capital and operating requirements and the ability to obtain all
requisite regulatory approvals.
No reserves have been assigned in connection with the Company's property interests to date, given their early
stage of development. The future value of the Company is therefore dependent on the success or otherwise of its
activities, which are principally directed toward the future exploration, appraisal and development of its assets, and
2AIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
potential acquisition of property interests in the future. Un-risked Contingent and Prospective Helium Volumes
have been dened at the Topaz Project. However, estimating helium volumes is subject to signicant uncertainties
associated with technical data and the interpretation of that data, future commodity prices, and development and
operating costs. There can be no guarantee that the Company will successfully convert its helium volume to
reserves and produce that estimated volume. Estimates may alter signicantly or become more uncertain when
new information becomes available due to for example, additional drilling or production tests over the life of eld.
As estimates change, development and production plans may also vary. Downward revision of helium volume
estimates may adversely aect the Company's operational or nancial performance.
Helium volume estimates are expressions of judgement based on knowledge, experience and industry practice.
These estimates are imprecise and depend to some extent on interpretations, which may ultimately prove to be
inaccurate and require adjustment or, even if valid when originally calculated, may alter signicantly when new
information or techniques become available. As further information becomes available through additional drilling
and analysis the estimates are likely to change. Any adjustments to volume could aect the Company's exploration
and development plans which may, in turn, aect the Company's performance. The process of estimating helium
resources is complex and requires signicant decisions and assumptions to be made in evaluating the reliability of
available geological, geophysical, engineering, and economic date for each property. Dierent engineers may make
dierent estimates of resources, cash ows, or other variables based on the same available data.
Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the
Company's control, which could cause actual results and events to dier materially from those that are disclosed in
or implied by such forward- looking statements. Such risks and uncertainties include, but are not limited to, that
Pulsar may be unsuccessful in drilling commercially productive wells; the uncertainty of resource estimation;
operational risks in conducting exploration, including that drill costs may be higher than estimates ; commodity
prices; health, safety and environmental factors; and other factors set forth above as well as risk factors included in
the Company’s Annual Information Form dated July 31, 2025 for the year ended September 30, 2024 found under
Company’s prole on www.sedarplus.ca.
Forward-looking statements contained in this news release are as of the date of this news release, and the
Company undertakes no obligation to update or revise any forward-looking statements, whether as a result of new
information, future events or otherwise, except as may be required by law. New factors emerge from time to time,
and it is not possible for the Company to predict all of them or assess the impact of each such factor or the extent
to which any factor, or combination of factors, may cause results to dier materially from those contained in any
forward-looking statement. No assurance can be given that the forward-looking statements herein will prove to beAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
correct and, accordingly, investors should not place undue reliance on forward-looking statements. Any forward-
looking statements contained in this news release are expressly qualied in their entirety by this cautionary
statement.
https://s203.q4cdn.com/212931576/files/doc_news/Pulsar-Helium-Announces-Jetstream-3-Encounters-Gas-With-Near-1000-psi-Bottom-Hole-Pressure-2025.pdf
Gas With Near-1,000 psi Bottom-Hole Pressure
2025-10-30
THIS ANNOUNCEMENT AND THE INFORMATION CONTAINED HEREIN IS RESTRICTED AND IS NOT FOR RELEASE,
PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM AUSTRALIA,
JAPAN OR THE REPUBLIC OF SOUTH AFRICA OR TO BE TRANSMITTED, DISTRIBUTED TO, OR SENT BY, ANY NATIONAL
OR RESIDENT OR CITIZEN OF ANY SUCH COUNTRIES OR ANY OTHER JURISDICTION IN WHICH SUCH RELEASE,
PUBLICATION OR DISTRIBUTION MAY CONTRAVENE LOCAL SECURITIES LAWS OR REGULATIONS.
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF THE UK VERSION OF
REGULATION (EU) NO. 596/2014 ON MARKET ABUSE, AS IT FORMS PART OF UK DOMESTIC LAW BY VIRTUE OF THE
EUROPEAN UNION (WITHDRAWAL) ACT 2018, AND REGULATION (EU) NO. 596/2014 ON MARKET ABUSE.
UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN
THE PUBLIC DOMAIN AND SUCH PERSONS SHALL THEREFORE CEASE TO BE IN POSSESSION OF INSIDE
INFORMATION
CASCAIS, Portugal, Oct. 30, 2025 (GLOBE NEWSWIRE) --
Pulsar Helium Inc. (AIM: PLSR, TSXV: PLSR, OTCQB: PSRHF) (“Pulsar” or the “Company”), a leading helium exploration and development company, is pleased to announce a major milestone at its agship Topaz Project in Minnesota.
The Jetstream #3 well commenced drilling on October 17 and has encountered pressurized gas with a calculated bottom-hole pressure of approximately 960 psi, underscoring a highly charged gas reservoir. This development marks a signicant step forward in the ongoing drilling campaign, building on the success of the earlier Jetstream
#1 and #2 wells and conrming the continuity of the helium-rich system.
Highlights:
Location: Jetstream #3 is located 0.6 miles (~950 meters) northeast of Jetstream #1 at the Topaz heliumAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
project in Minnesota.
Pressurized gas zones: Jetstream #3 intersected two gas-bearing intervals at approximately 1,717 (523 meters) and 2,036 feet (621 meters) depth, with bottom-hole pressure estimated at ~960 psi at 2,167 feet (661 meters), which is the depth at the time of writing this news release (and is subject to change when the hole is deepened and nal bottom hole and well-head pressures are obtained when total depth is achieved). This
strong pressure reading indicates a robust, pressurized reservoir at the well location, a major validation of the Topaz eld’s potential. For comparison, Jetstream #1 had a bottom hole pressure of 185 psi when drilled in 2024, and Jetstream #2 had a bottom hole pressure of 205 psi when drilled in 2025.
Advancing drilling operations: Jetstream #3 has a planned total depth of ~3,500 feet (1,067 meters) and is being drilled using the coring method with a hole diameter of 3.8 inches (96 mm).
Visible gas: Drilling personnel observed gas bubbling in the drilling mud returns at surface during pipe connections. This indicates an active gas inux from the formation while drilling is underway.
Next steps, testing and analysis: Upon reaching total depth, Jetstream #3 will undergo comprehensive evaluation. A suite of open-hole wireline logs will be run to collect detailed geological and petrophysical data, an optical televiewer will be used to image the well-bore wall geology, followed by a proposed controlled ow- testing and pressure build-up program to measure well deliverability. All core and gas samples will be sent for laboratory analysis to determine gas composition and helium concentrations, including testing for the rare
helium-3 isotope discovered in Jetstream #1.
Thomas Abraham-James, President & CEO of Pulsar, commented:
“Encountering such strong gas pressure at Jetstream #3 is extremely encouraging for our team. A near-1,000 psi bottom-hole pressure suggests we have a highly charged reservoir at this location. This outcome not only validates the geological model we built from Jetstream #1 and #2, but also boosts our condence as we continue drilling and begin the testing phase. We will proceed carefully to collect comprehensive data, including gas samples for lab analysis, to fully understand the reservoir’s characteristics. It’s an exciting milestone for Pulsar as we advance Topaz toward becoming a leading primary helium project in North America.”
Jetstream #3 Well Update
Jetstream #3, the rst well in Pulsar’s new multi-well program at Topaz, was spudded on October 17 . The well encountered a gas show at ~1,717 feet vertical depth and again at ~2,036 feet, within 100 vertical feet of the thAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
interpreted depth of the known helium-bearing zone identied in Jetstream #1. Upon penetrating these intervals, a signicant inux of gas was observed, and bottom-hole pressure was calculated at ~960 psi at 2,167 feet. This pressure level is a strong indicator of a pressurized reservoir but is subject to change as the hole is deepened and final bottom hole and well-head pressure readings are obtained. The presence of pressurized gas at such depth is a major milestone for the project, conrming that the targeted formations are charged with gas as anticipated.
Drilling is ongoing on a 24-hour schedule with rotating crews. Jetstream #3 has currently surpassed 2,167 feet of depth and continues toward the planned total depth of 3,500 feet. The well is being drilled using continuous HQ core drilling (large-diameter core of ~63.5 mm) to maximize sample recovery. This drilling method is providing abundant physical core samples for geological analysis while maintaining ecient progress. Notably, gas is bubbling through the drill mud while drilling and becomes more evident when a new drill pipe connection is made.
Once Jetstream #3 reaches total depth, Pulsar will initiate a comprehensive downhole evaluation program. This includes a suite of open-hole wireline logs, ow testing and pressure build-up analysis on the well. Concurrent with field testing, core and gas samples from Jetstream #3 will undergo thorough laboratory analysis. The lab program
will determine the gas composition and exact helium content of the samples. Importantly, the analysis will include assays for helium-3, a rare isotope of helium, given that helium-3 was previously detected in the Topaz reservoir at notable levels (refer to News Release dated October 1, 2025). The Company is eager to see if Jetstream #3 exhibits a
similar helium-3 signature, which would further underscore the unique character and value of the Topaz helium discovery.
About the Topaz Project
The Topaz project is located in northern Minnesota, USA, where Pulsar is the rst mover and holds exclusive leases.
Drilling at the Jetstream #1 appraisal well reached a total depth (“TD”) of 5,100 feet (1,555 meters) in January 2025, successfully penetrating the entire interpreted helium-bearing reservoir and beyond. Drilling of the Jetstream #2 appraisal well was completed on February 1, 2025, reaching a TD of 5,638 feet (1,718 meters). In August 2025, the
Jetstream #1 well was successfully ow-tested using a wellhead compressor, delivering a peak gas ow rate of approximately 1.3 million cubic feet per day with a sustained ow of 7–8% helium (as helium-4). Recent laboratory analyses have also conrmed the presence of helium-3 in measurable concentrations, representing one of the highest naturally occurring helium-3 values publicly reported in a terrestrial gas reservoir. The forthcoming multi-well drilling campaign will build on these results to expand Pulsar’s understanding of the reservoir and advance Topaz toward development.
On behalf Pulsar Helium Inc.AIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
Pulsar Helium Inc
“Thomas Abraham-James”
President, CEO and Director
Further Information:
Pulsar Helium Inc.
connect@pulsarhelium.com
+ 1 (218) 203-5301 (USA/Canada)
+44 (0) 2033 55 9889 (United Kingdom)
https://pulsarhelium.com
https://ca.linkedin.com/company/pulsar-helium-inc.
Yellow Jersey PR Limited
(Financial PR)
Charles Goodwin / Annabelle Wills
+44 777 5194 357
pulsarhelium@yellowjerseypr.com
Strand Hanson Limited
(Nominated & Financial Adviser, and Joint Broker)
Ritchie Balmer / Rob Patrick / Richard Johnson
+44 (0) 207 409 3494
OAK Securities*
(Joint Broker)
Richard McGlashan / Mungo Sheehan
+44 7879 646641 / +44 7788 266844
richard.mcglashan@oak-securities.com / mungo.sheehan@oak-securities.com
*OAK Securities is the trading name of Merlin Partners LLP, a rm incorporated in the United Kingdom and
regulated by the UK Financial Conduct Authority.
About Pulsar Helium Inc.
Pulsar Helium Inc. is a publicly traded company quoted on the AIM market of the London Stock Exchange and listed
on the TSX Venture Exchange with the ticker PLSR, as well as on the OTCQB with the ticker PSRHF. Pulsar's portfolioAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
consists of its agship Topaz helium project in Minnesota, USA, and the Tunu helium project in Greenland. Pulsar is
the rst mover in both locations with primary helium occurrences not associated with the production of
hydrocarbons identied at each.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is dened in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Qualied Person Signo
In accordance with the AIM Note for Mining and Oil and Gas Companies, the Company discloses that Brad Cage, VP
Engineering and Ocer of the Company has reviewed the technical information contained herein. Mr. Cage has
approximately 25 years in the oil and gas industry, is a member of the Society of Petroleum Engineers and is a
licenced professional petroleum engineer in Oklahoma, USA.
Forward-Looking Statements
This news release contains forward-looking information within the meaning of Canadian securities legislation
(collectively, "forward-looking statements") that relate to the Company's current expectations and views of future
events. Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives,
assumptions or future events or performance (often, but not always, through the use of words or phrases such as
"will likely result", "are expected to", "expects", "will continue", "is anticipated", "anticipates", "believes", "estimated",
"intends", "plans", "forecast", "projection", "strategy", "objective" and "outlook") are not historical facts and may be
forward-looking statements. Forward-looking statements herein include, but are not limited to, statements relating
to the statements regarding bringing the Topaz project to production, anticipated full plant construction contract in
2026, nal investment decision being made in 2026, the potential impact of the drill results, ow testing and
pressure testing on the next iteration of the resource estimate; the potential of CO and/or Helium-3 as a valuable
by-product of the Company’s future helium production; and the potential for future wells. Forward-looking
statements may involve estimates and are based upon assumptions made by management of the Company,
including, but not limited to, the Company's capital cost estimates, management's expectations regarding the
availability of capital to fund the Company's future capital and operating requirements and the ability to obtain all
requisite regulatory approvals.
No reserves have been assigned in connection with the Company's property interests to date, given their early
stage of development. The future value of the Company is therefore dependent on the success or otherwise of its
activities, which are principally directed toward the future exploration, appraisal and development of its assets, and
2AIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
potential acquisition of property interests in the future. Un-risked Contingent and Prospective Helium Volumes
have been dened at the Topaz Project. However, estimating helium volumes is subject to signicant uncertainties
associated with technical data and the interpretation of that data, future commodity prices, and development and
operating costs. There can be no guarantee that the Company will successfully convert its helium volume to
reserves and produce that estimated volume. Estimates may alter signicantly or become more uncertain when
new information becomes available due to for example, additional drilling or production tests over the life of eld.
As estimates change, development and production plans may also vary. Downward revision of helium volume
estimates may adversely aect the Company's operational or nancial performance.
Helium volume estimates are expressions of judgement based on knowledge, experience and industry practice.
These estimates are imprecise and depend to some extent on interpretations, which may ultimately prove to be
inaccurate and require adjustment or, even if valid when originally calculated, may alter signicantly when new
information or techniques become available. As further information becomes available through additional drilling
and analysis the estimates are likely to change. Any adjustments to volume could aect the Company's exploration
and development plans which may, in turn, aect the Company's performance. The process of estimating helium
resources is complex and requires signicant decisions and assumptions to be made in evaluating the reliability of
available geological, geophysical, engineering, and economic date for each property. Dierent engineers may make
dierent estimates of resources, cash ows, or other variables based on the same available data.
Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the
Company's control, which could cause actual results and events to dier materially from those that are disclosed in
or implied by such forward- looking statements. Such risks and uncertainties include, but are not limited to, that
Pulsar may be unsuccessful in drilling commercially productive wells; the uncertainty of resource estimation;
operational risks in conducting exploration, including that drill costs may be higher than estimates ; commodity
prices; health, safety and environmental factors; and other factors set forth above as well as risk factors included in
the Company’s Annual Information Form dated July 31, 2025 for the year ended September 30, 2024 found under
Company’s prole on www.sedarplus.ca.
Forward-looking statements contained in this news release are as of the date of this news release, and the
Company undertakes no obligation to update or revise any forward-looking statements, whether as a result of new
information, future events or otherwise, except as may be required by law. New factors emerge from time to time,
and it is not possible for the Company to predict all of them or assess the impact of each such factor or the extent
to which any factor, or combination of factors, may cause results to dier materially from those contained in any
forward-looking statement. No assurance can be given that the forward-looking statements herein will prove to beAIM: PLSR | TSXV: PLSR | OTCQB: PSRHFPulsar Helium Inc
Rua Frederico Arouca, nº 251, 2º frente, 2750-356, Cascais, Portugal
connect@pulsarhelium.com
pulsarhelium.com
pulsarhelum.com
Pulsar Helium Inc
correct and, accordingly, investors should not place undue reliance on forward-looking statements. Any forward-
looking statements contained in this news release are expressly qualied in their entirety by this cautionary
statement.
https://s203.q4cdn.com/212931576/files/doc_news/Pulsar-Helium-Announces-Jetstream-3-Encounters-Gas-With-Near-1000-psi-Bottom-Hole-Pressure-2025.pdf
Recent PSRHF News
- Pulsar Helium Announces the Appointment of DGWA as European Financial Markets and Corporate Advisor • GlobeNewswire Inc. • 04/21/2026 06:00:00 AM
- ABCrescent Cooperatief U.A. Announces Filing of Updated Early Warning Report in Relation to Pulsar Helium Inc. • Newsfile • 04/14/2026 12:28:00 AM
- Pulsar Helium Announces Officer Appointment • GlobeNewswire Inc. • 04/02/2026 06:15:00 AM
- Pulsar Helium Announces Director Resignation and Exercise of Stock Options • GlobeNewswire Inc. • 04/01/2026 06:00:00 AM
- Pulsar Helium Reports Completion of Jetstream #7 and Commencement of Down-Hole Logging at the Topaz Helium Project, USA • GlobeNewswire Inc. • 03/18/2026 06:00:00 AM
- Pulsar Helium Appoints Stephen Lange Ranzini to the Board of Directors and as Deputy Chair • GlobeNewswire Inc. • 03/17/2026 06:00:00 AM
- Pulsar Helium Provides Update on Transaction With Oscillate PLC • GlobeNewswire Inc. • 03/09/2026 06:00:00 AM
- Pulsar Helium Reports Pressurized Gas Encounter at Jetstream #7 at the Topaz Helium Project, USA • GlobeNewswire Inc. • 03/04/2026 07:00:00 AM
- Pulsar Helium Announces Closing of Fundraise • GlobeNewswire Inc. • 02/27/2026 10:30:00 PM
- Pulsar Files Financial and Operating Results for the First Quarter Ended December 31, 2025 • GlobeNewswire Inc. • 02/26/2026 07:00:00 AM
- Pulsar Helium Reports Commencement of Jetstream #7 and Completion of Seismic Survey at the Topaz Helium Project, USA • GlobeNewswire Inc. • 02/23/2026 07:00:00 AM
- Pulsar Helium Announces Result of Fundraise and TVR • GlobeNewswire Inc. • 02/20/2026 07:30:00 AM
- Pulsar Helium Announces Equity Fundraising of Approximately US$10 Million • GlobeNewswire Inc. • 02/19/2026 06:10:51 PM
- Pulsar Helium Reports Additional High-Pressure Gas Zones Encountered at Jetstream #6, Topaz Helium Project, USA • GlobeNewswire Inc. • 02/16/2026 07:00:00 AM
- Pulsar Helium Provides Update on Transaction with Oscillate PLC • GlobeNewswire Inc. • 02/10/2026 07:00:00 AM
- Pulsar Helium Reports Pressurized Gas Encounter at Jetstream #6 at the Topaz Helium Project, USA • GlobeNewswire Inc. • 02/09/2026 07:00:00 AM
- ABCrescent Cooperatief U.A. Announces Filing of Updated Early Warning Report in Relation to Pulsar Helium Inc. • Newsfile • 01/30/2026 10:08:00 PM
- Pulsar Helium Files Financial and Operating Results for the Year Ended September 30, 2025 • GlobeNewswire Inc. • 01/29/2026 07:00:00 AM
- Pulsar Helium Announces Completion of Jetstream #5 and Mobilization to Commence Jetstream #6 at the Topaz Helium Project, USA • GlobeNewswire Inc. • 01/28/2026 07:00:00 AM
- Pulsar Helium Commences 2D Seismic Program at Topaz Helium Project • GlobeNewswire Inc. • 01/21/2026 07:30:00 AM
- Pulsar Helium Provides Update on Transaction with Oscillate PLC • GlobeNewswire Inc. • 01/21/2026 07:00:00 AM
- U.S. Federal Government Laboratories Verify Helium-3 Results at Pulsar Helium’s Topaz Project in the USA • GlobeNewswire Inc. • 01/19/2026 07:00:00 AM
- Pulsar Helium Reports Additional High-Pressure Gas Encounter at Jetstream #5 and Outlines Upcoming Testing Program • GlobeNewswire Inc. • 01/09/2026 07:00:00 AM
- Pulsar Helium Announces Acquisition of Michigan Helium Exploration Assets-Focused Gas Exploration Company • GlobeNewswire Inc. • 01/05/2026 07:00:00 AM
- Pulsar Helium Closes Major Minnesota Land Position to the West of Topaz Project • GlobeNewswire Inc. • 12/19/2025 07:00:00 AM
