| Followers | 57 |
| Posts | 13694 |
| Boards Moderated | 9 |
| Alias Born | 06/25/2009 |
Thursday, August 14, 2025 8:57:58 PM
Thanks for the shout out 9Coastal I kinda forgot about this one.
I have been hanging out at battery manufaturers AMPX QS SLDP and drones.
Just did a quick AI search to refresh my mind..
Nothing below this line has been double check by me
Here’s a comprehensive update on 5E Advanced Materials Inc. (NASDAQ: FEAM / ASX: 5EA), covering their permit status, production progress, and financials:
🏗️ Permit Status: Production, Not Just Exploration
Fort Cady Project in California is fully permitted for commercial production under a UIC (Underground Injection Control) permit granted by the EPA.
The permit allows for in-situ recovery of boron and lithium and includes a 25-year operational life with a 5-year restoration phase.
The company has completed all required conditions for mining commencement, including well installation, monitoring, and EPA documentation.
🧪 Production Status (2025)
5E is actively producing boric acid at its Small-Scale Facility (SSF) and has begun customer qualification shipments.
Recent output includes:
2,800 pounds of boric acid over a weekend
Targeting 3 short tons/day in near-term steady-state operations
Head grade performance has exceeded expectations:
Historical: ~3.7%
Current: 5.5–6.0%, with a target of 7.0%+
The company is optimizing CAPEX and OPEX by shifting from vertical to horizontal wells and exploring value-added byproducts like calcium chloride, magnesium hydroxide, and lithium.
💰 Financial Snapshot
As of Q1 2025, 5E is still considered pre-revenue, with only ~$50K in statutory revenue and no significant operational income.
They’ve raised $6.35 million via private placement to support commercialization.
The Fort Cady SK-1300 Technical Report estimates:
Pre-tax NPV7: $724.8 million
IRR: 19.2%
Mine life: 39.5 years
Here’s a detailed snapshot of boron pricing and its 10-year trajectory:
📈 Current Boron Prices (as of mid-2025)
Region Price (USD/MT) Source
USA $757/MT IMARC Group
China $701/MT IMARC Group
Germany $593/MT IMARC Group
Turkey $597/MT IMARC Group
Brazil $684/MT IMARC Group
These prices reflect natural boron ore or boric acid equivalents, depending on the reporting source.
📊 10-Year Price Trend Overview
While exact monthly data points are proprietary, the long-term trend shows:
2015–2019: Stable pricing around $300–$400/MT, driven by steady demand in glass, ceramics, and agriculture.
2020–2022: Modest uptick due to supply chain disruptions and rising energy costs.
2023–2025: Significant rise, with prices nearly doubling in some regions. This was fueled by:
Increased demand in renewables, semiconductors, and defense
Limited new supply (only one permitted new project globally: Fort Cady by 5E Advanced Materials)
Export constraints from Turkey and South America
The BusinessAnalytiq Boron Price Index offers a visual chart summarizing regional trends and forecasts.
🔍 Strategic Insight
Boron’s price trajectory mirrors early lithium dynamics:
Inelastic demand: A little boron goes a long way in many applications.
Supply bottlenecks: Only a handful of global deposits meet economic and geological criteria.
Emerging tech: Borophene (“white graphene”) and neutron absorption in nuclear tech are pushing demand into new frontiers.
I have been hanging out at battery manufaturers AMPX QS SLDP and drones.
Just did a quick AI search to refresh my mind..
Nothing below this line has been double check by me
Here’s a comprehensive update on 5E Advanced Materials Inc. (NASDAQ: FEAM / ASX: 5EA), covering their permit status, production progress, and financials:
🏗️ Permit Status: Production, Not Just Exploration
Fort Cady Project in California is fully permitted for commercial production under a UIC (Underground Injection Control) permit granted by the EPA.
The permit allows for in-situ recovery of boron and lithium and includes a 25-year operational life with a 5-year restoration phase.
The company has completed all required conditions for mining commencement, including well installation, monitoring, and EPA documentation.
🧪 Production Status (2025)
5E is actively producing boric acid at its Small-Scale Facility (SSF) and has begun customer qualification shipments.
Recent output includes:
2,800 pounds of boric acid over a weekend
Targeting 3 short tons/day in near-term steady-state operations
Head grade performance has exceeded expectations:
Historical: ~3.7%
Current: 5.5–6.0%, with a target of 7.0%+
The company is optimizing CAPEX and OPEX by shifting from vertical to horizontal wells and exploring value-added byproducts like calcium chloride, magnesium hydroxide, and lithium.
💰 Financial Snapshot
As of Q1 2025, 5E is still considered pre-revenue, with only ~$50K in statutory revenue and no significant operational income.
They’ve raised $6.35 million via private placement to support commercialization.
The Fort Cady SK-1300 Technical Report estimates:
Pre-tax NPV7: $724.8 million
IRR: 19.2%
Mine life: 39.5 years
Here’s a detailed snapshot of boron pricing and its 10-year trajectory:
📈 Current Boron Prices (as of mid-2025)
Region Price (USD/MT) Source
USA $757/MT IMARC Group
China $701/MT IMARC Group
Germany $593/MT IMARC Group
Turkey $597/MT IMARC Group
Brazil $684/MT IMARC Group
These prices reflect natural boron ore or boric acid equivalents, depending on the reporting source.
📊 10-Year Price Trend Overview
While exact monthly data points are proprietary, the long-term trend shows:
2015–2019: Stable pricing around $300–$400/MT, driven by steady demand in glass, ceramics, and agriculture.
2020–2022: Modest uptick due to supply chain disruptions and rising energy costs.
2023–2025: Significant rise, with prices nearly doubling in some regions. This was fueled by:
Increased demand in renewables, semiconductors, and defense
Limited new supply (only one permitted new project globally: Fort Cady by 5E Advanced Materials)
Export constraints from Turkey and South America
The BusinessAnalytiq Boron Price Index offers a visual chart summarizing regional trends and forecasts.
🔍 Strategic Insight
Boron’s price trajectory mirrors early lithium dynamics:
Inelastic demand: A little boron goes a long way in many applications.
Supply bottlenecks: Only a handful of global deposits meet economic and geological criteria.
Emerging tech: Borophene (“white graphene”) and neutron absorption in nuclear tech are pushing demand into new frontiers.
IF THERE IS ONE THING I AM SURE ABOUT IS I AM USUALLY WRONG
Recent FEAM News
- 5E Advanced Materials Reports Key Fiscal Q3 2026 Commercial and Operational Milestones • ACCESS Newswire • 05/13/2026 12:30:00 PM
- 5E Advanced Materials Signs First Milestone Offtake Heads of Agreement with Domestic Industrial Customer • ACCESS Newswire • 05/12/2026 08:01:00 PM
- 5E Advanced Materials to Host Third Fiscal Quarter 2026 Call • ACCESS Newswire • 05/05/2026 12:30:00 PM
- 5E Advanced Materials Appoints Jonathan Siegler to Support Next Phase of Project Financing • ACCESS Newswire • 04/13/2026 12:30:00 PM
- 5E Advanced Materials to Participate in Water Tower Research Insights Conference on April 14, 2026 • ACCESS Newswire • 04/08/2026 12:30:00 PM
- VIDEO - BTV Visits Equinox Gold, Mineros, Elemental Royalty, 5E Advanced Materials, Alkane Resources, Contango Silver & Gold, and Osisko Development • Newsfile • 04/01/2026 10:00:00 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 03/31/2026 09:18:52 PM
- 5E Advanced Materials Advances Toward Offtake Agreements Following Customer Roadshow • ACCESS Newswire • 03/26/2026 12:30:00 PM
- BTV Spotlights: Picard Medical, Contango, GMG, 5E Advanced, Klondike Gold, Nevada Organic, Nine Mile, FireFox, & Intrepid Metals • Newsfile • 03/20/2026 01:00:00 PM
- 5E Advanced Materials Successful R&D Produces Breakthrough Meta Boric Acid Product (80% B2O3 Content), Opening High-Value Market Opportunities • ACCESS Newswire • 03/11/2026 12:30:00 PM
- 5E Advanced Materials Launches Ferroboron Trial Program to Support U.S. Mine-to-Magnet Supply Chain • ACCESS Newswire • 02/25/2026 01:30:00 PM
- 5E Advanced Materials Hosts Q2 Call; Highlights Ferroboron Initiative, Federal Grant Application and Customer Engagement • ACCESS Newswire • 02/18/2026 01:30:00 PM
- 5E Advanced Materials to Host Fiscal Q2 Call • ACCESS Newswire • 02/10/2026 09:10:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/04/2026 09:30:07 PM
- Form SCHEDULE 13D/A - General Statement of Acquisition of Beneficial Ownership: [Amend] • Edgar (US Regulatory) • 02/04/2026 09:30:05 PM
- 5E Advanced Materials Targets Ferroboron to Support U.S. Mine-to-Magnet Supply Chain • ACCESS Newswire • 02/04/2026 01:30:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/03/2026 09:03:48 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/03/2026 09:03:16 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 02/03/2026 09:01:26 PM
- 5E Advanced Materials Announces Closing of $36 Million Upsized and Oversubscribed Public Offering of Common Stock • ACCESS Newswire • 02/03/2026 09:01:00 PM
- 5E Advanced Materials Prices $36 Million Upsized and Oversubscribed Public Offering of Common Stock • ACCESS Newswire • 01/30/2026 03:30:00 AM
- 5E Advanced Materials Shares Slide After $30 Million Equity Offering Plan • IH Market News • 01/28/2026 04:03:23 PM
- 5E Advanced Materials Successfully Completes LCD Glass Trial for Major U.S. LCD Glass Manufacturer • ACCESS Newswire • 01/08/2026 01:30:00 PM
- 5E Advanced Materials Files Foundational U.S. Patent to Protect Closed-Loop In-situ Boron Mining and Production Technology • ACCESS Newswire • 12/17/2025 01:30:00 PM
- 5E Advanced Materials to Present at RedChip Virtual Critical Minerals Conference • ACCESS Newswire • 12/09/2025 09:05:00 PM
