• Magnetotelluric (MT) geophysical survey is well underway; Data from several stations has already been captured. The survey is on track to finish within the next two weeks. • Preliminary 1D and 2D resistivity inversions from the first three MT survey lines have been generated and are under review by the technical team. • A 3D inversion of the MT data will be completed once all field data is collected, with results expected 2–4 weeks after survey completion. • 599 out of the planned 1,200 geochemical samples have been collected (~50% of the program). • Approximately 17–20 days remain to complete the geochemical sampling collection campaign. https://api.investi.com.au/api/announcements/dtr/61c22567-2ce.pdf