New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment, the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate . This will maximize and front load our profitability, both from increased production volumes and higher grade concentrate relative to head grade ( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation nozzpack thanks