--- "Figure 13. Proposed drillhole locations, oblique view looking north. Drill hole EX5 is 300 m in length for scale COST BENEFIT ANALYSIS Figure 9. D-Zone plan view cross sections at 340 m depth (a) Geological section (b) Contoured block grade concentration. RESOURCE ESTIMATION AND CLASSIFICATION OKA-1 Standard 1 To bring the Nemegosenda Lake historic niobium deposit up to CIM and NI 43-101 standards for reporting reserves, a preliminary design for economic extraction through a strategic mine plan is required. Figure 12 shows the team’s preliminary design of an open pit mine. The parameters listed below are based on estimates from industry and basic rockmass parameters [5]. F The objectives of this project are to: • Design an advanced exploration program for niobium mineralization in the D-Zone to gain confidence in geometry, extent, grade and tonnage • Evaluate economics of D-Zone niobium mineralization • Conceptualize a preliminary mine-plan for mineral extraction"
---
The above looks like a solid plan to me. Why did I have to go to this link to find out about it?