This sounds like a rational plan...

---
"Figure 13. Proposed drillhole locations,
oblique view looking north. Drill hole EX5 is
300 m in length for scale
COST BENEFIT ANALYSIS
Figure 9. D-Zone plan view cross sections at 340 m
depth (a) Geological section (b) Contoured block
grade concentration.
RESOURCE ESTIMATION AND CLASSIFICATION
OKA-1 Standard
1
To bring the Nemegosenda Lake historic niobium deposit up to CIM and
NI 43-101 standards for reporting reserves, a preliminary design for
economic extraction through a strategic mine plan is required. Figure 12
shows the team’s preliminary design of an open pit mine. The
parameters listed below are based on estimates from industry and basic
rockmass parameters [5].

F
The objectives of this project are to:
• Design an advanced exploration program for niobium mineralization
in the D-Zone to gain confidence in geometry, extent, grade and
tonnage
• Evaluate economics of D-Zone niobium mineralization
• Conceptualize a preliminary mine-plan for mineral extraction"


---

The above looks like a solid plan to me. Why did I have to go to this link to find out about it?

http://www.canada-resources.ie/index.php/investor-relations/2-uncategorised

---