Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
GNCC undiscovered, now getting attention.
Agree. Picked up more myself.
MWWC is on the verge of reshaping itself after the detroit mess.
Alot of investors here do not understand when the big three take a hit, the little guy dies. Over 31% of all parts manufacturers have went belly up (complete death, bankruptcy or both) since early 2007. Those that did not die either merged, or sold warrants and/or convertibles to stay alive.
MWWC is coming back from that mess and is showing vast improvement with major contracts again with Detroits big two.
As we all know MWWC has revamped their plant to accomodate a new industrial contract to be named soon. MWWC has stated they will add a third shift if necessary to accomdate this contract.
Overall I like the way MWWC swings in PPS. It shows that most shares are getting locked up and takes about 2M shares to move this 50% or better.
To those wanting a promotional pump, I say go look at the promotions going on. They are dying in the first 45 minutes of trading. Paid promotions mean one thing. Insiders selling period.
MWWC will get the exposure it needs through GM and FORD. Actions speak louder than words and MWWC is getting all the action right now in the automotive industry. The Chevy Sonic production numbers should be out in December.
My two cents is this. Once the paid awareness is gone, APII will bounce.
GNCC Aug 10th news:
Genco Corp (Pink Sheets: GNCC) is proud to introduce the Rosebowl Amphitheater in Winona, Texas. The historic Rosebowl Speedway will re-open to the public as The Rosebowl Amphitheater. The conversion is planned to be completed on March 20, 2012. This will signal a new era of entertainment in East Texas. Genco CEO Robert Hardy stated, the “Rosebowl is one of Smith County’s true treasures. Genco Corporation is preserving a valuable part of Smith County, and creating more opportunities for Smith County, and Winona, community businesses. Another wonderful forum for unique entertainment will now be available for residents and tourists alike to enjoy for years to come!” Originally opened in 1970's, the Rosebowl Speedway was one of Smith County’s oldest and most cherished Automobile Dirt Race Tracks until it closed last April for Remodeling. Management plans to begin Outdoor Concerts at the new Rosebowl Amphitheater in March of 2012. The newly opened outdoor Amphitheater will provide guest with increased seating capacity, food concessions, and an outdoor movie screen, allowing for more flexibility in its year-round operation. The new and modern venue will host world-class entertainment consisting of live music, plays, fairs, and festivals, and cinema events.
About Genco Corp: Genco Corporation is a real estate developer specializing in underutilized properties, event centers and buildings. The company also operates as a promoter, marketer and sponsor of activities such as concerts, and festivals. The Company also plans to provide souvenir-merchandising services, food and beverage at the Rosebowl Amphitheater and other sports and music related events.
Forward-Looking Statements
This press release contains statements, which may constitute "forward-looking statements" within the meaning of the Securities Act of 1933 and the Securities Exchange Act of 1934, as amended by the Private Securities Litigation Reform Act of 1995. Prospective investors are cautioned that any such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, and that actual results may differ materially from those contemplated by such forward-looking statements. Important factors currently known to management that could cause actual results to differ materially from those in forward-looking statements include fluctuation of operating results, the ability to compete successfully, and the ability to complete before-mentioned transactions. The Company or management undertakes no obligation to update or revise forward-looking statements to reflect changed assumptions, the occurrence of unanticipated events, or changes to future operating results.
GNCC on alert. L2 thin and undiscovered current stock.
GNCC undiscovered territory.
Chart is thrown off by a .033 buy out of sequence yesterday.
Agree 100%
MWWC looks to ride out better than forecasted by some here. Slow and steady upward is what I like also. I will take a 7% increase anyday over a massive dump and lose 40%.
MWWC has steadily pushed upward with no pump. Somedays sees spikes but is warranted when news comes and those who sell the news. Looking forward to 2012.
MWWC outperforming 98% of all pink stocks.
As of now most stocks are not performing as they did. Runs would last days not hours or minutes. It seems most want a small profit and move on.
I did not sell one share yesterday. The company was not diluting. If you look at fridays persons on board who were talking and then yesterday, you can deduce that they were probably the ones selling.
MWWC had a tough two years, but so did the auto industry as a whole. MWWC business model needed restructured to make it competitive and profitable. The company is doing just that.
With the orders from GM, and now Ford (new orders) coming in and the industrial contract to be announced MWWC will be back were it was post 2007.
BWMG huge promo scam alert. Buyer beware
BWMG scam being promo'd to death.
From 10Q Aug 15th.
Going Concern –The accompanying consolidated financial statements have been prepared assuming the Company will continue as a going concern, which contemplates realization of assets and the satisfaction of liabilities in the normal course of business for the twelve-month period following the date of these financial statements. However, we have incurred losses since 2009, and expect to have losses into a portion of 2011. We have had a working capital deficit since 2009. Although cured effective the fourth quarter 2010, the Company defaulted on its first mortgage in the third quarter of 2010, which resulted in an automatic default on its second mortgage further discussed in Note. 9. NOTES PAYABLE
BWMG scam being promo'd again.
MWWC on alert.
MWWC just received another major contract. This one with Ford. MWWC will produce for FORD interior parts for the dash board of the F-150 series truck.
Two weeks ago MWWC announced a three year contract with GM to supply parts for the 2012 Chevy Sonic for an initial three years. If the Sonic sells well the contract will be extended.
MWWC about to abnnounce a major industrial contract next month that is valued in the millions.
All DD for MWWC is the Ibox on the MWWC board.
MWWC lands another huge contract.
MWWC has landed a major contract with FORD motor company.
HOWELL, MI: September 26, 2011: MWW Automotive Group (OTCQB: MWWC), a global design, engineering, and manufacturing firm serving some of the world’s leading automotive and industrial manufacturers, announced today that it has begun production for the painting and fulfillment of interior parts for the Ford F-150 series line of trucks.
The MWW interior package produced for the Ford F-150 includes several dashboard components, which will all be finished and delivered from the MWW Class-A painting facility in Baroda, Michigan. This is the second new automotive program that has been awarded to MWW in the last two months after the start of production for the new Chevy Sonic.
Charles Pinkerton, CEO of MWW Automotive stated:” We are very excited to be involved with the Ford F-150, the number one selling truck in the U.S. This interior program is yet another one of several new MWW automotive projects that we have secured over the last few months. Several new programs with other manufacturers have been quoted, facility certification has been concluded and we expect to begin production with those programs in our first quarter.
Supplying components for the F-150 is another milestone on our path to further establish ourselves as one of the premier manufacturers for specialized painting and logistics projects in the automotive and industrial industries. It reflects our continuing commitment to deliver only the highest quality product to our clients. We are planning to provide a complete overview of our new automotive and industrial projects soon. Rainer Poertner, responsible for business development and investor relations and myself will stay in close contact with our investors, to keep you informed about the progress of the Company’s new projects.”
About MWW Automotive Group (MWW)
MWW’s is headquartered in Howell, Michigan, with a “Class A” painting/assembly/logistics facility in Baroda, Michigan for the production of OE quality automotive and industrial products. The MWW Automotive Group (OTCQB: MWWC) delivers its in-house designed accessory products and Class A painting, assembly and logistics services directly to major global automobile manufacturers’ Vehicle Processing Centers (VPC) and/or assembly lines in the United States, Canada and Europe. MWW’s industrial products are delivered directly to the manufacturers for installation in their facilities. Noted for its adherence to the highest quality requirements and its advanced logistics capabilities, MWW products and services consistently meet and exceed customers’ expectations and requirements. MWW provides substantial added value to the sale of vehicles and industrial products for leading international automobile and industrial manufacturers such as Toyota, BMW, Chevrolet, Hyundai, Kia Motors, GM, Ford, Deere and Whirlpool. For more information please visit www.mwwautomotive.com or e-mail investorrelations@mwwautomotive.com.
MWWC on high alert..
MWWC has landed another major contract. The first is the Chevy sonic which is contracted for an initial three years.
and now.....
HOWELL, MI: September 26, 2011: MWW Automotive Group (OTCQB: MWWC), a global design, engineering, and manufacturing firm serving some of the world’s leading automotive and industrial manufacturers, announced today that it has begun production for the painting and fulfillment of interior parts for the Ford F-150 series line of trucks.
The MWW interior package produced for the Ford F-150 includes several dashboard components, which will all be finished and delivered from the MWW Class-A painting facility in Baroda, Michigan. This is the second new automotive program that has been awarded to MWW in the last two months after the start of production for the new Chevy Sonic.
Charles Pinkerton, CEO of MWW Automotive stated:” We are very excited to be involved with the Ford F-150, the number one selling truck in the U.S. This interior program is yet another one of several new MWW automotive projects that we have secured over the last few months. Several new programs with other manufacturers have been quoted, facility certification has been concluded and we expect to begin production with those programs in our first quarter.
Supplying components for the F-150 is another milestone on our path to further establish ourselves as one of the premier manufacturers for specialized painting and logistics projects in the automotive and industrial industries. It reflects our continuing commitment to deliver only the highest quality product to our clients. We are planning to provide a complete overview of our new automotive and industrial projects soon. Rainer Poertner, responsible for business development and investor relations and myself will stay in close contact with our investors, to keep you informed about the progress of the Company’s new projects.”
About MWW Automotive Group (MWW)
MWW’s is headquartered in Howell, Michigan, with a “Class A” painting/assembly/logistics facility in Baroda, Michigan for the production of OE quality automotive and industrial products. The MWW Automotive Group (OTCQB: MWWC) delivers its in-house designed accessory products and Class A painting, assembly and logistics services directly to major global automobile manufacturers’ Vehicle Processing Centers (VPC) and/or assembly lines in the United States, Canada and Europe. MWW’s industrial products are delivered directly to the manufacturers for installation in their facilities. Noted for its adherence to the highest quality requirements and its advanced logistics capabilities, MWW products and services consistently meet and exceed customers’ expectations and requirements. MWW provides substantial added value to the sale of vehicles and industrial products for leading international automobile and industrial manufacturers such as Toyota, BMW, Chevrolet, Hyundai, Kia Motors, GM, Ford, Deere and Whirlpool. For more information please visit www.mwwautomotive.com or e-mail investorrelations@mwwautomotive.com.
MWWC small floater on alert..
Float 25M.
MWWC an automotive parts manufacturer located in Howell Michigan has landed two major contracts with the automotive industry.
MMWC is now producing interior parts for the 2012 Chevy Sonic. The intial contract is for three years production. If the Sonic does well the contract will be extended. Total price of all interior parts per car is $600.00.
MWWC has just placed on the IR twitter account (Rainer) this news that will be available at 9am Monday before opening bell.
HOWELL, MI: September 26, 2011: MWW Automotive Group (OTCQB: MWWC), a global design, engineering, and manufacturing firm serving some of the world’s leading automotive and industrial manufacturers, announced today that it has begun production for the painting and fulfillment of interior parts for the Ford F-150 series line of trucks.
The MWW interior package produced for the Ford F-150 includes several dashboard components, which will all be finished and delivered from the MWW Class-A painting facility in Baroda, Michigan. This is the second new automotive program that has been awarded to MWW in the last two months after the start of production for the new Chevy Sonic.
Charles Pinkerton, CEO of MWW Automotive stated:” We are very excited to be involved with the Ford F-150, the number one selling truck in the U.S. This interior program is yet another one of several new MWW automotive projects that we have secured over the last few months. Several new programs with other manufacturers have been quoted, facility certification has been concluded and we expect to begin production with those programs in our first quarter.
Supplying components for the F-150 is another milestone on our path to further establish ourselves as one of the premier manufacturers for specialized painting and logistics projects in the automotive and industrial industries. It reflects our continuing commitment to deliver only the highest quality product to our clients. We are planning to provide a complete overview of our new automotive and industrial projects soon. Rainer Poertner, responsible for business development and investor relations and myself will stay in close contact with our investors, to keep you informed about the progress of the Company’s new projects.”
About MWW Automotive Group (MWW)
MWW’s is headquartered in Howell, Michigan, with a “Class A” painting/assembly/logistics facility in Baroda, Michigan for the production of OE quality automotive and industrial products. The MWW Automotive Group (OTCQB: MWWC) delivers its in-house designed accessory products and Class A painting, assembly and logistics services directly to major global automobile manufacturers’ Vehicle Processing Centers (VPC) and/or assembly lines in the United States, Canada and Europe. MWW’s industrial products are delivered directly to the manufacturers for installation in their facilities. Noted for its adherence to the highest quality requirements and its advanced logistics capabilities, MWW products and services consistently meet and exceed customers’ expectations and requirements. MWW provides substantial added value to the sale of vehicles and industrial products for leading international automobile and industrial manufacturers such as Toyota, BMW, Chevrolet, Hyundai, Kia Motors, GM, Ford, Deere and Whirlpool. For more information please visit www.mwwautomotive.com or e-mail investorrelations@mwwautomotive.com.
MWWC chart breakout.
MWWC has continued to hold and move forward the last few trading sessions.
Friday saw MWWC create an engulfing bullish pattern with a long white Marobozu form. The TRIX and the MACD signal uptrend continuation with RSI at 57 (well below power zone).
MWWC on wednesday had a golden cross of the 10Dma and the 20Dma and the gap continues to widen.
MWWC looking to head back towards its highs of .075-.09 in the medium term and maybe a little faster when the Big industrial contract is announced.
As of Now MWWC is making interior parts for the 2012 Chevy Sonic and has an initial three year commitment. If the car does well that contract can be extended.
MWWC has added a third assembly line to accomodate a contract to be announced shortly. This contract will take up mmost of MMWC manpower and the company has stated in the jun 27 PR they will accomodate this by adding a third shift.
MWWC a real company with real contracts.
A white Marobozu formed on friday with an overll bullish engulfing. The trix confirms reversal and continuation upswing. Golden cross on the 10Dma and the 20Dma happened on wednesday and continues to widen positive.
Mornin Bman;
GM's Sonic is not industrial it is automotive. Industrial would be something like Siemans or maytag.
MWWC has expanded their site and is ready to add a third shift if necessary for this new contract to be announced.
MWWC about to announce a major contract.
Here is a great exerpt from the Jun 27 2011 PR.
Chuck Pinkerton states further: "We have expedited this expansion in light of our advanced negotiations with our new industrial clients, whose products will not only require oversized production lines, but also a large percentage of our production capacity. We expect to finalize the negotiations and begin with the start-up procedures soon. We will make another announcement about the substantial size of these new projects as soon as we commence with production.
It seems this new client is huge. It will take up alot of space already completed and this is what Mr. Pinkerton stated about adding more personnel:
"The increasing number of programs that have been awarded to us along with those still in negotiation for production to begin in the near and midterm future, have made this step necessary," states Chuck Pinkerton, the CEO of MWW Automotive. "Fortunately we have been preparing for this expansion for some time and have secured the necessary resources, such as the required equipment and skilled personnel far in advance. Accordingly, we are able to get this rather large expansion project up and running without having to spend significant resources and are able to commence production with a 2nd and if necessary 3rd production shift on a second production line quickly and when needed
This contract for MWWC is going to out shine the GM deal it seems since they have added to their existing facility.
Here is a great exerpt from the Jun 27 2011 PR.
Chuck Pinkerton states further: "We have expedited this expansion in light of our advanced negotiations with our new industrial clients, whose products will not only require oversized production lines, but also a large percentage of our production capacity. We expect to finalize the negotiations and begin with the start-up procedures soon. We will make another announcement about the substantial size of these new projects as soon as we commence with production.
It seems this new client is huge. It will take up alot of space already completed and this is what Mr. Pinkerton stated about adding more personnel:
"The increasing number of programs that have been awarded to us along with those still in negotiation for production to begin in the near and midterm future, have made this step necessary," states Chuck Pinkerton, the CEO of MWW Automotive. "Fortunately we have been preparing for this expansion for some time and have secured the necessary resources, such as the required equipment and skilled personnel far in advance. Accordingly, we are able to get this rather large expansion project up and running without having to spend significant resources and are able to commence production with a 2nd and if necessary 3rd production shift on a second production line quickly and when needed
This contract for MWWC is going to out shine the GM deal it seems since they have added to their existing facility to accomdate them.
Here is the NYC chamber of commerce website showing Vizzeco in New York with a Robert Shulhauser as the contact info and the phone number 905-319-3456.
https://www.ny-chamber.com/directory_results.asp
Once the website pops up place Vizzeco in the Search business directory upper left column and press enter.
With Vizzeco HQ in Canada they do have a small office in NYC and registered with the NYC chamber of commerce.
MWWC alert.
MWWC a major part supplier to Toyota has resumed full production.
MWWC supplies parts to these toyota makes:
http://mwwautomotive.com/Products/products%20showcase/MWW_automotive_showcase.htm
With Toyota now in full swing, MWWC should see a significant rev boost fourth Q.
MWWC has landed a major three year contract with General Motors to provide parts to the 2012 Chevy Sonic that begins production October 1st.
MWWC has added a new assembly line and another shift to accomodate a major industrial contract to be announced in October.
As we all know pinky stocks can be vague about who they are providing services to (never saying a companies name i.e a major car company instead of GM) But MWWC has major contracts with GM, BMW, Toyota, Honda, Hyundai to provide OEM parts for their vehicles. If they were lying they would be sued in a new york minute.
Here is their website to get familar with the company and its strategies. http://mwwautomotive.com/index.htm
MWWC looking good.
MWW is a leading designer and manufacturer of OE accessories for the automotive industry for the customization of cars, sport utility vehicles and light trucks.
MWW has operations in the United States and Germany and delivers its products directly to select global automobile manufacturers’ vehicle processing centers and/or assembly lines in the United States, Canada and Europe. The VPC’s and assembly lines’ technical teams install the MWW products in a variety of vehicle types and deliver the accessorized automobiles into the dealer channels in their respective countries.
MWW has been consistently expanding operations through the addition of new large customers and the acquisition of carefully selected companies in our core industry that compliment and supplement our existing resources. Based on MWW’s global presence and depth of resources, we believe that we are well positioned to meet and exceed the demand of our current and future customers. We will always thrive to fully utilize our outstanding R&D and Design capabilities, to consistently broaden our product range and deliver new and innovative products to our target markets.
Innovations
• Toyota RAV4 integrated running board with distinctive design.
• APDM 850TM - Power Distribution Module - One Easy-Access Power Distribution Box
• Running Boards for Mercedes, BMW and Audi
• Design & Logistics Services for BMW in Germany
Product Range
• Exterior Systems
• Interior Systems
• Exhaust Systems
• Electronic Systems
R&D Services
• Design Concepts
• Engineering
• Manufacturing
• Painting
• Assembly/ Logistics
MWWC OTC.BB stock on alert.
With toyota back in full production and a three year contract with General Motors to supply parts for the 2012 Chevy sonic is just the beginning.
MWWC took a huge hit when Toyota shut down almost 80% of their production line after the tsunami. The Second Q revs were down over 1M. With Toyota back in full swing and trying to make up lost time MWWC is in overdrive to provide parts.
General Motors signed a three year contract with MWWC to provide parts for the 2012 chevy Sonic that starts production October 1st.
MWWC has added a third line and another shift to their facility ramping up for a major industrial contract that is to be announced next month.
MWWC is a stock that has major distribution contracts (not phony subsidiaries) such as GM, Toyota, John Deere,and Now GM the PPS at .017 is amazingly low. MWWC has a 21M float with a 54M O/S.
Fourth Q revs should see MWWC moving back up into the .05-.075 range in the medium term.
MWWC on alert.
MWWC about to announce a major contract that has MWWC adding a third line to their existing shop and hiring another shift.
MWWC has major contracts with Toyota, Honda, and now GM for three years to provide parts to the all new 2012 Chevy Sonic.
As of last week Toyota is back in full production. Toyota is a major revenue stream for MWWC and the company saw a decline in revs in the second Q due to the tsunami in japan.
To All APII investors.
APII has as of 31 Aug 2001 a short sale of over 60K shares. This is a 351% short. This does not include the Sept 15th Short sales that will be posted on the 30th.
Some investors here represent certain firms that is shorting the stock and will contribute nothing to the forum except rumors and innuendos to create a false persona of a bad company.
APII for two consecutive days has held the .09 area well showing that indeed a bottom has formed. As the shorts become due more negativity will be posted.
MWWC looking to score big.
MWWC has posted its three year contract to supply parts to GM for its new line of car the Chevy Sonic.
First and foremost MWW automotive has taken a big second Q hit due to Toyota shutting down over 80% production in the second Q. MWW automotive took a big revenue hit of 1M+. MWW had many convertibles due.
UBSS and VFIN led the way into dilution taking MWWC down to .009 from its highs of .09. Those convertibles are gone as of the last two weeks with UBSS now showing a .06 ask price and VFIN gone since last friday.
Toyota has resumed full production again and GM is looking to redefine its image with the chevy sonic in the compact range.
MWWC has added a third assembly line to its production plant and is about to announce in October a new industrial contract (IMO either painting or finishing parts) that could give MMWC a boost back to the .06-.075 range by end of year.
To all board members. I would like to apologize for misinformation placed on the BB stock board. I Have placed a redaction to clear up the confusion. My sincere apologies to everyone invested here.
APII looking to go forward.
APII has taken a beating with the shorts lately. The Aug 31st short is over 60K shares adding up to over 340%.
With AUTO leading the way on shorts, The MM has directly resulted in a 60% decrease in PPS from its high at .33
APII has roughly 5M Float, and a A/S of 35M shares.
In the last two trading sessions investors have counted for over a million shares in the .07-.10 range leaving one to assume that the 200Dma is major support and that APII investors is accumulating the shorts brought on by AUTO.
Watch for APII to regain traction in the coming sessions as the merger with Vizzeco and the meeting with bangladesh delegates could prove very lucrative to savvy investors looking for a bargain with a 5M float.
MWWC redaction.
MWWC has checked the 5-7M revenue box not the 50-75M box. Sorry for the misinformation.
MWWC has a strategic alliance with Howell that provides parts to Fiat, not MWWC directly.
Hope it clears the confusion. My sincere apologies.
MWWC trading action today. MWWC had a pullback mirroring the DOW.
As there were 2X more buying than sells, BID support was small since investor4s are looking to stay liquid and hunt for bargains once the markets find bottom.
MWWC has a three year contract with GM to produce parts for the Chevy Sonic.
MWWC has less than a 25M float and a 53M O/S.
MWWC has added a third line intheir shop to accomodate an industrial contract that is to be announced in October.
MWWC has sent specialty parts to Italy Fiat for a possible contract.
MWWC has over 85 employess and has a revenue stream of 50-75M a year.
MWWC about to go.
MWWC alert. Major bids at .02 and MM's moving into the .06 area.
APII on bounce alert. Major volume towards end of day showing buying in the .085-.09 range. APII down 61% from a high of .33 cents last month.
MWWC moving up.
MWWC last week started monday at .0115. In five trading days going to .0235 and now holding .021. There is no pump nor scam here.
MWWC has received a multi-year contract with GM to deliver parts for the chevy sonic.
MWWC has added a third assembly line in their production facility for a big industrial contract coming (not named as of yet).
MWWC has started shipping parts again to Toyota. Toyota was only working at 35% capacity in all plants right after the tsunami.
MWWC has shipped examples to Italy Fiat in anticipation of further negotiations.
MWWC moving up.
MWWC last week started monday at .0115. In five trading days going to .0235 and now holding .021. There is no pump nor scam here.
MWWC has received a multi-year contract with GM to deliver parts for the chevy sonic.
MWWC has added a third assembly line in their production facility for a big industrial contract coming (not named as of yet).
MWWC has started shipping parts again to Toyota. Toyota was only working at 35% capacity in all plants right after the tsunami.
MWWC has shipped examples to Italy Fiat in anticipation of further negotiations..
MIKP (.0008) has news.
Mike the Pike Productions, Inc. (Pink Sheets: MIKP) (www.mtpprods.com) announces today that it has submitted a formal notice of default to Advanced Content Services, Inc. (Pink Sheets: ADCS) regarding its proposed acquisition of MTP’s ServeNation early last year.
ServeNation (www.servenation.com) is a prepaid debit card platform in a $300+ billion market, implementing a ‘Give while you Live’ consumer/spending lifestyle that looks to harvest sustainable connection and awareness among consumers, corporations and charitable/non-profit organizations.
The company was to be sold to Advanced Content Services, Inc. under a friendly acquisition agreement which, to date, according to MIKP Board and its consultants, has not been paid for in line with the original agreement, which calls for payment, over time, in a combination of shares in ADCS and cash.
Though the shares have been delivered to MIKP, no cash payments to date have been made, giving MIKP the right, under the Notice of Default, to recall ownership of the ServeNation name, business model and intellectual property therein if agreed upon payment is not made by October 1st, 2011.
Mike The Pike Productions recently completed principle photography on its sci-fi thriller, ‘White Space’, starring Holt McCallany (The Gangster Squad, Bullet to the Head), and is currently in post-production toward worldwide sales agreements. The film is the first on the studio’s slate, which includes ‘The Skin Trade’ based on award winning author George R.R. Martin’s novella by the same name. Martin is the author/creator behind HBO’s Emmy Nominated ‘Game of Thrones’.
Check out IPOdesktop’s Mike the Pike Productions Analyst Report
http://www.gaskinsco.com/linkto-mikp.shtml
Want more than just press releases? Check out our blog! http://blog.mtpprods.com
Safe Harbor: This release may contain forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Statements contained in this release that are not historical facts may be deemed to be forward-looking statements. Investors are cautioned that forward-looking statements are inherently uncertain. Actual performance and results may differ materially from that projected or suggested herein due to certain risks and uncertainties including, without limitation, ability to obtain financing and regulatory and shareholder approvals for anticipated actions.
MIKP has news.